Where do we stand with fuzzy project scheduling?

Fuzzy project scheduling has interested several researchers in the past two decades; about 20 articles have been written on this issue. Contrary to stochastic project-scheduling approaches that are used by many project schedulers, and even if the axiomatic associated to the theory of probabilities i...

Descripción completa

Detalles Bibliográficos
Autores principales: Bonnal, Pierre, Gourc, Didier, Lacoste, Germain
Lenguaje:eng
Publicado: 2004
Materias:
Acceso en línea:https://dx.doi.org/10.1061/(ASCE)0733-9364(2004)130:1(114)
http://cds.cern.ch/record/903027
_version_ 1780908715008851968
author Bonnal, Pierre
Gourc, Didier
Lacoste, Germain
author_facet Bonnal, Pierre
Gourc, Didier
Lacoste, Germain
author_sort Bonnal, Pierre
collection CERN
description Fuzzy project scheduling has interested several researchers in the past two decades; about 20 articles have been written on this issue. Contrary to stochastic project-scheduling approaches that are used by many project schedulers, and even if the axiomatic associated to the theory of probabilities is not always compatible with decision-making situations, fuzzy project-scheduling approaches that are most suited to these situations have been kept in the academic sphere. This paper starts by recalling the differences one can observe between uncertainty and imprecision. Then most of the published research works that have been done in this field are summarized. Finally, a framework for addressing the resource-constrained fuzzy project- scheduling problem is proposed. This framework uses temporal linguistic descriptors, which might become very interesting features to the project-scheduling practitioners.
id cern-903027
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2004
record_format invenio
spelling cern-9030272019-09-30T06:29:59Zdoi:10.1061/(ASCE)0733-9364(2004)130:1(114)http://cds.cern.ch/record/903027engBonnal, PierreGourc, DidierLacoste, GermainWhere do we stand with fuzzy project scheduling?Information Transfer and ManagementFuzzy project scheduling has interested several researchers in the past two decades; about 20 articles have been written on this issue. Contrary to stochastic project-scheduling approaches that are used by many project schedulers, and even if the axiomatic associated to the theory of probabilities is not always compatible with decision-making situations, fuzzy project-scheduling approaches that are most suited to these situations have been kept in the academic sphere. This paper starts by recalling the differences one can observe between uncertainty and imprecision. Then most of the published research works that have been done in this field are summarized. Finally, a framework for addressing the resource-constrained fuzzy project- scheduling problem is proposed. This framework uses temporal linguistic descriptors, which might become very interesting features to the project-scheduling practitioners.oai:cds.cern.ch:9030272004
spellingShingle Information Transfer and Management
Bonnal, Pierre
Gourc, Didier
Lacoste, Germain
Where do we stand with fuzzy project scheduling?
title Where do we stand with fuzzy project scheduling?
title_full Where do we stand with fuzzy project scheduling?
title_fullStr Where do we stand with fuzzy project scheduling?
title_full_unstemmed Where do we stand with fuzzy project scheduling?
title_short Where do we stand with fuzzy project scheduling?
title_sort where do we stand with fuzzy project scheduling?
topic Information Transfer and Management
url https://dx.doi.org/10.1061/(ASCE)0733-9364(2004)130:1(114)
http://cds.cern.ch/record/903027
work_keys_str_mv AT bonnalpierre wheredowestandwithfuzzyprojectscheduling
AT gourcdidier wheredowestandwithfuzzyprojectscheduling
AT lacostegermain wheredowestandwithfuzzyprojectscheduling