Cargando…
A linear-discrete scheduling model for the resource constrainted project scheduling problem
Autores principales: | Bonnal, P, Gourc, D, Hameri, A P, Lacoste, G |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1080/01446190500040869 http://cds.cern.ch/record/908463 |
Ejemplares similares
-
Where do we stand with fuzzy project scheduling?
por: Bonnal, Pierre, et al.
Publicado: (2004) -
Constraint-based scheduling: applying constraint programming to scheduling problems
por: Baptiste, Philippe, et al.
Publicado: (2001) -
A planning and scheduling system for the LHC project
por: Bachy, Gérard, et al.
Publicado: (1995) -
Planning and scheduling for the Large Hadron Collider Project
por: Bachy, Gérard, et al.
Publicado: (1996) -
Planning and scheduling for distributed, one-off and complex system projects
por: Kotamaki, M, et al.
Publicado: (1998)