Cargando…
Concreting the SPS vault
The excavation of the three transfer tunnels which connect the SPS to its injector, the PS in Lab I, and its two experimental areas was completed during 1974.
Publicado: |
1974
|
---|---|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/916880 |