Cargando…

Concreting the SPS vault

The excavation of the three transfer tunnels which connect the SPS to its injector, the PS in Lab I, and its two experimental areas was completed during 1974.

Detalles Bibliográficos
Publicado: 1974
Materias:
Acceso en línea:http://cds.cern.ch/record/916880

Ejemplares similares