Cargando…

Beam current transformer (BCT) for experiment WA1/2

In experiment WA1/2, a 400 GeV proton beam from the SPS was directed at a target, downstream of which a hadron line selected, in several narrow momentum bands, a beam of either pi+ and K+ or pi- and K-. These neutrino-parent particles, before entering a 292 m long decay tunnel, passed through a set...

Descripción completa

Detalles Bibliográficos
Autor principal: CERN PhotoLab
Publicado: 1978
Materias:
Acceso en línea:http://cds.cern.ch/record/917343