Cargando…

The North Area High Intensity Facility (NAHIF) is under way

On the right are the stepped excavations forming a pyramid protecting site workers from landslips and facilitating the excavations of the access shafts. On the foreground lays the heavy concrete floor of the experimental hall (Annual Report 1978 p. 124).

Detalles Bibliográficos
Publicado: 1978
Materias:
Acceso en línea:http://cds.cern.ch/record/917432