Cargando…
At the RF Lab (EF Division)
Preparation work for the 3.5 m travelling-wave cavities to be installed at the SPS (see Annual Report 1979). Artur Scharding stands on the Left,
Publicado: |
1977
|
---|---|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/917820 |
Ejemplares similares
-
At the RF Lab (EF Division)
Publicado: (1977) -
At the RF Lab, EF Division
Publicado: (1980) -
At the RF Lab, EF Division
Publicado: (1980) -
Lab II, drawing office
Publicado: (1975) -
Inside the Assembly Hall in Lab II
Publicado: (1974)