Cargando…
First sector of TEC+ integrated at the integration facility in Aachen. Now being readout and debugged.
First sector of TEC+ integrated at the integration facility in Aachen. Now being readout and debugged.
Publicado: |
2006
|
---|---|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/921487 |
Ejemplares similares
-
Images of the CMS Tracker Endcap (TEC)
por: Brice, M
Publicado: (2008) -
Images of the CMS Tracker Integration Facility (TIF)
por: Eppard, M
Publicado: (2008) -
Silicon Tracker Integration Facility (TIF) under construction in CERN Buiding 186 (14 October 2005).
Publicado: (2005) -
CMS Tracker Readout Prototype Front-End Driver PCI Mezzanine Card (Mk1) (connector side)
por: J.Coughlan
Publicado: (1998) -
TIB Layer 4 being assembled and cabled in Pisa
por: Roberto dell'Orso
Publicado: (2006)