Status And Operating Experience of The TTF Coupler
Five accelerating modules are installed in the VUV FEL linac so far. This includes 40 high power couplers connected to the superconducting cavities, eight in every module. All of them are processed and operated up to the cavity performance limits. The coupler processing procedure is described. The p...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2004
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/926004 |
Sumario: | Five accelerating modules are installed in the VUV FEL linac so far. This includes 40 high power couplers connected to the superconducting cavities, eight in every module. All of them are processed and operated up to the cavity performance limits. The coupler processing procedure is described. The performance in relation to the test results on the coupler test stands are discussed. |
---|