Cargando…
First Experience with the New LEIR Digital Beam Control System
CERN's Low Energy Ion Ring (LEIR) is now equipped with a new all-digital beam control system. This was successfully used in November and December 2005, during the initial phase of the LEIR commissioning, when LEIR was running with O4+ particles. The beam was routinely captured and accelerated t...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/926362 |
_version_ | 1780909428647657472 |
---|---|
author | Angoletta, Maria Elena Findlay, A |
author_facet | Angoletta, Maria Elena Findlay, A |
author_sort | Angoletta, Maria Elena |
collection | CERN |
description | CERN's Low Energy Ion Ring (LEIR) is now equipped with a new all-digital beam control system. This was successfully used in November and December 2005, during the initial phase of the LEIR commissioning, when LEIR was running with O4+ particles. The beam was routinely captured and accelerated to the cycle top energy. Several development sessions were devoted to gaining experience with and fine-tuning the main system capabilities, i.e. frequency program, phase/radial loops and radial steering. In addition, the digital data acquisition system, developed as part of the control system, was very useful to both RF-experts as well as LEIR commissioning team members for observing important signals such as the measured magnetic field and the beam radial position at a given location in the machine. The experience gained during these development sessions is described. |
id | cern-926362 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2006 |
record_format | invenio |
spelling | cern-9263622019-09-30T06:29:59Zhttp://cds.cern.ch/record/926362engAngoletta, Maria ElenaFindlay, AFirst Experience with the New LEIR Digital Beam Control SystemAccelerators and Storage RingsCERN's Low Energy Ion Ring (LEIR) is now equipped with a new all-digital beam control system. This was successfully used in November and December 2005, during the initial phase of the LEIR commissioning, when LEIR was running with O4+ particles. The beam was routinely captured and accelerated to the cycle top energy. Several development sessions were devoted to gaining experience with and fine-tuning the main system capabilities, i.e. frequency program, phase/radial loops and radial steering. In addition, the digital data acquisition system, developed as part of the control system, was very useful to both RF-experts as well as LEIR commissioning team members for observing important signals such as the measured magnetic field and the beam radial position at a given location in the machine. The experience gained during these development sessions is described.AB-Note-2006-003CERN-AB-Note-2006-003oai:cds.cern.ch:9263622006-02-14 |
spellingShingle | Accelerators and Storage Rings Angoletta, Maria Elena Findlay, A First Experience with the New LEIR Digital Beam Control System |
title | First Experience with the New LEIR Digital Beam Control System |
title_full | First Experience with the New LEIR Digital Beam Control System |
title_fullStr | First Experience with the New LEIR Digital Beam Control System |
title_full_unstemmed | First Experience with the New LEIR Digital Beam Control System |
title_short | First Experience with the New LEIR Digital Beam Control System |
title_sort | first experience with the new leir digital beam control system |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/926362 |
work_keys_str_mv | AT angolettamariaelena firstexperiencewiththenewleirdigitalbeamcontrolsystem AT findlaya firstexperiencewiththenewleirdigitalbeamcontrolsystem |