Cargando…
Commissioning and first measurements on the CTF3 chicane
The transfer line between the linac and the first recombination ring (Delay Loop) of the CTF3 project hs been installed at CERN in spring-summer 2004. In the transfer line a magnetic chicane is used to tune the length of the bunches coming from the linac in order to minimize the Coherent Synchrotron...
Autores principales: | , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/928418 |
_version_ | 1780909462596354048 |
---|---|
author | Ghigo, Andrea Alesini, David Benedetti, Gabriele Biscari, Caterina Castellano, Michele Corsini, Roberto Drago, Alessandro Filippetto, Daniele Lefèvre, Thibaut Marcellini, Fabio Milardi, Catia Preger, Barbara Serio, Mario Sgamma, Francesco Stella, Angelo Tecker, Frank A Zobov, Mikhail |
author_facet | Ghigo, Andrea Alesini, David Benedetti, Gabriele Biscari, Caterina Castellano, Michele Corsini, Roberto Drago, Alessandro Filippetto, Daniele Lefèvre, Thibaut Marcellini, Fabio Milardi, Catia Preger, Barbara Serio, Mario Sgamma, Francesco Stella, Angelo Tecker, Frank A Zobov, Mikhail |
author_sort | Ghigo, Andrea |
collection | CERN |
description | The transfer line between the linac and the first recombination ring (Delay Loop) of the CTF3 project hs been installed at CERN in spring-summer 2004. In the transfer line a magnetic chicane is used to tune the length of the bunches coming from the linac in order to minimize the Coherent Synchrotron Radiation contribution to the beam energy spread in the recombination system. The first measurements of the beam parameters at several linac and stretcher settings are described. We report the compression curve as a function of the optical parameter R56 representing the dependence of the longitudinal position of a particle on its energy, obtained by measuring the bunch length with a 3 GHz RF deflector. |
id | cern-928418 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2005 |
record_format | invenio |
spelling | cern-9284182022-08-17T13:35:08Zhttp://cds.cern.ch/record/928418engGhigo, AndreaAlesini, DavidBenedetti, GabrieleBiscari, CaterinaCastellano, MicheleCorsini, RobertoDrago, AlessandroFilippetto, DanieleLefèvre, ThibautMarcellini, FabioMilardi, CatiaPreger, BarbaraSerio, MarioSgamma, FrancescoStella, AngeloTecker, Frank AZobov, MikhailCommissioning and first measurements on the CTF3 chicaneAccelerators and Storage RingsThe transfer line between the linac and the first recombination ring (Delay Loop) of the CTF3 project hs been installed at CERN in spring-summer 2004. In the transfer line a magnetic chicane is used to tune the length of the bunches coming from the linac in order to minimize the Coherent Synchrotron Radiation contribution to the beam energy spread in the recombination system. The first measurements of the beam parameters at several linac and stretcher settings are described. We report the compression curve as a function of the optical parameter R56 representing the dependence of the longitudinal position of a particle on its energy, obtained by measuring the bunch length with a 3 GHz RF deflector.oai:cds.cern.ch:9284182005 |
spellingShingle | Accelerators and Storage Rings Ghigo, Andrea Alesini, David Benedetti, Gabriele Biscari, Caterina Castellano, Michele Corsini, Roberto Drago, Alessandro Filippetto, Daniele Lefèvre, Thibaut Marcellini, Fabio Milardi, Catia Preger, Barbara Serio, Mario Sgamma, Francesco Stella, Angelo Tecker, Frank A Zobov, Mikhail Commissioning and first measurements on the CTF3 chicane |
title | Commissioning and first measurements on the CTF3 chicane |
title_full | Commissioning and first measurements on the CTF3 chicane |
title_fullStr | Commissioning and first measurements on the CTF3 chicane |
title_full_unstemmed | Commissioning and first measurements on the CTF3 chicane |
title_short | Commissioning and first measurements on the CTF3 chicane |
title_sort | commissioning and first measurements on the ctf3 chicane |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/928418 |
work_keys_str_mv | AT ghigoandrea commissioningandfirstmeasurementsonthectf3chicane AT alesinidavid commissioningandfirstmeasurementsonthectf3chicane AT benedettigabriele commissioningandfirstmeasurementsonthectf3chicane AT biscaricaterina commissioningandfirstmeasurementsonthectf3chicane AT castellanomichele commissioningandfirstmeasurementsonthectf3chicane AT corsiniroberto commissioningandfirstmeasurementsonthectf3chicane AT dragoalessandro commissioningandfirstmeasurementsonthectf3chicane AT filippettodaniele commissioningandfirstmeasurementsonthectf3chicane AT lefevrethibaut commissioningandfirstmeasurementsonthectf3chicane AT marcellinifabio commissioningandfirstmeasurementsonthectf3chicane AT milardicatia commissioningandfirstmeasurementsonthectf3chicane AT pregerbarbara commissioningandfirstmeasurementsonthectf3chicane AT seriomario commissioningandfirstmeasurementsonthectf3chicane AT sgammafrancesco commissioningandfirstmeasurementsonthectf3chicane AT stellaangelo commissioningandfirstmeasurementsonthectf3chicane AT teckerfranka commissioningandfirstmeasurementsonthectf3chicane AT zobovmikhail commissioningandfirstmeasurementsonthectf3chicane |