Commissioning of the LHC Cryogenic System: Subsystems Cold Commissioning in Preparation of Full Sector Tests

The cryogenic system for the Large Hadron Collider accelerator is presently in its final phase of installation and commissioning at nominal operating temperatures. The refrigeration capacity for the LHC will be produced using eight large cryogenic plants installed on five technical sites and distrib...

Descripción completa

Detalles Bibliográficos
Autores principales: Serio, L, Calzas, A, Ferlin, G, Gilbert, N, Gruehagen, Henning, Knoops, S, Parente, C, Sanmartí, M
Lenguaje:eng
Publicado: 2006
Materias:
Acceso en línea:https://dx.doi.org/10.1063/1.2202585
http://cds.cern.ch/record/928903
_version_ 1780909470201675776
author Serio, L
Calzas, A
Ferlin, G
Gilbert, N
Gruehagen, Henning
Knoops, S
Parente, C
Sanmartí, M
author_facet Serio, L
Calzas, A
Ferlin, G
Gilbert, N
Gruehagen, Henning
Knoops, S
Parente, C
Sanmartí, M
author_sort Serio, L
collection CERN
description The cryogenic system for the Large Hadron Collider accelerator is presently in its final phase of installation and commissioning at nominal operating temperatures. The refrigeration capacity for the LHC will be produced using eight large cryogenic plants installed on five technical sites and distributed around the 26.7-km circumference ring located in a deep underground tunnel. The status of the cryogenic system commissioning is presented together with the experience gained in operating and commissioning it.
id cern-928903
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2006
record_format invenio
spelling cern-9289032023-05-31T13:23:00Zdoi:10.1063/1.2202585http://cds.cern.ch/record/928903engSerio, LCalzas, AFerlin, GGilbert, NGruehagen, HenningKnoops, SParente, CSanmartí, MCommissioning of the LHC Cryogenic System: Subsystems Cold Commissioning in Preparation of Full Sector TestsAccelerators and Storage RingsThe cryogenic system for the Large Hadron Collider accelerator is presently in its final phase of installation and commissioning at nominal operating temperatures. The refrigeration capacity for the LHC will be produced using eight large cryogenic plants installed on five technical sites and distributed around the 26.7-km circumference ring located in a deep underground tunnel. The status of the cryogenic system commissioning is presented together with the experience gained in operating and commissioning it.LHC-Project-Report-862CERN-LHC-Project-Report-862oai:cds.cern.ch:9289032006-01-11
spellingShingle Accelerators and Storage Rings
Serio, L
Calzas, A
Ferlin, G
Gilbert, N
Gruehagen, Henning
Knoops, S
Parente, C
Sanmartí, M
Commissioning of the LHC Cryogenic System: Subsystems Cold Commissioning in Preparation of Full Sector Tests
title Commissioning of the LHC Cryogenic System: Subsystems Cold Commissioning in Preparation of Full Sector Tests
title_full Commissioning of the LHC Cryogenic System: Subsystems Cold Commissioning in Preparation of Full Sector Tests
title_fullStr Commissioning of the LHC Cryogenic System: Subsystems Cold Commissioning in Preparation of Full Sector Tests
title_full_unstemmed Commissioning of the LHC Cryogenic System: Subsystems Cold Commissioning in Preparation of Full Sector Tests
title_short Commissioning of the LHC Cryogenic System: Subsystems Cold Commissioning in Preparation of Full Sector Tests
title_sort commissioning of the lhc cryogenic system: subsystems cold commissioning in preparation of full sector tests
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1063/1.2202585
http://cds.cern.ch/record/928903
work_keys_str_mv AT seriol commissioningofthelhccryogenicsystemsubsystemscoldcommissioninginpreparationoffullsectortests
AT calzasa commissioningofthelhccryogenicsystemsubsystemscoldcommissioninginpreparationoffullsectortests
AT ferling commissioningofthelhccryogenicsystemsubsystemscoldcommissioninginpreparationoffullsectortests
AT gilbertn commissioningofthelhccryogenicsystemsubsystemscoldcommissioninginpreparationoffullsectortests
AT gruehagenhenning commissioningofthelhccryogenicsystemsubsystemscoldcommissioninginpreparationoffullsectortests
AT knoopss commissioningofthelhccryogenicsystemsubsystemscoldcommissioninginpreparationoffullsectortests
AT parentec commissioningofthelhccryogenicsystemsubsystemscoldcommissioninginpreparationoffullsectortests
AT sanmartim commissioningofthelhccryogenicsystemsubsystemscoldcommissioninginpreparationoffullsectortests