Cargando…
Commissioning of the LHC Cryogenic System: Subsystems Cold Commissioning in Preparation of Full Sector Tests
The cryogenic system for the Large Hadron Collider accelerator is presently in its final phase of installation and commissioning at nominal operating temperatures. The refrigeration capacity for the LHC will be produced using eight large cryogenic plants installed on five technical sites and distrib...
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2006
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1063/1.2202585 http://cds.cern.ch/record/928903 |