Cargando…
Commissioning of the LHC Cryogenic System: Subsystems Cold Commissioning in Preparation of Full Sector Tests
The cryogenic system for the Large Hadron Collider accelerator is presently in its final phase of installation and commissioning at nominal operating temperatures. The refrigeration capacity for the LHC will be produced using eight large cryogenic plants installed on five technical sites and distrib...
Autores principales: | Serio, L, Calzas, A, Ferlin, G, Gilbert, N, Gruehagen, Henning, Knoops, S, Parente, C, Sanmartí, M |
---|---|
Lenguaje: | eng |
Publicado: |
2006
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1063/1.2202585 http://cds.cern.ch/record/928903 |
Ejemplares similares
-
Large Cryogenic Infrastructure for LHC Superconducting Magnet and Cryogenic Component Tests: Layout, Commissioning and Operational Experience
por: Calzas, A, et al.
Publicado: (2004) -
Commissioning the Cryogenic System of the First LHC Sector
por: Millet, F, et al.
Publicado: (2008) -
The Cryogenic System for the LHC Test String 2: Design, Commissioning and Operation
por: Blanco-Viñuela, E, et al.
Publicado: (2002) -
Commissioning of the Cryogenics of the LHC Long Straight Sections
por: Perin, A., et al.
Publicado: (2010) -
Validation and Performance of the LHC Cryogenic System through Commissioning of the First Sector
por: Serio, L, et al.
Publicado: (2007)