Hardware Commissioning of the LHC: Quality Assurance, follow-up and storing of the test results
During the commissioning of the LHC technical systems [1] (the so-called Hardware Commissioning) a large number of test sequences and procedures will be applied to the different systems and components of the accelerator. All the information related to the coordination of the Hardware Commissioning w...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/929751 |
Sumario: | During the commissioning of the LHC technical systems [1] (the so-called Hardware Commissioning) a large number of test sequences and procedures will be applied to the different systems and components of the accelerator. All the information related to the coordination of the Hardware Commissioning will be structured and managed towards the final objective of integrating all the data produced in the Manufacturing and Test Folders (MTF) [2] at both equipment level (i.e. individual system tests) and commissioning level (i.e.Hardware Commissioning). The MTF for Hardware Commissioning will be mainly used to archive the results of the tests (i.e. status, parameters and waveforms) which will be used later as reference during the operation with beam. Also it is an indispensable tool for monitoring the progress of the different tests and ensuring the proper follow-up of the procedures described in the engineering specifications; in this way, the Quality Assurance process will be completed. This paper describes the specifications for the development of the MTFs, their general structure, as well as the methodology used for their implementation in an optimal and reliable way. |
---|