Cargando…
One of the ALICE Absorber beam pipes ready for lowering into the solenoid magnet for NEG coating.
Publicado: |
2006
|
---|---|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/931594 |
Ejemplares similares
-
One end of the vacuum sector during the bakeout and pure gas refill of ALICE's central beryllium beam pipe and absorber beam pipe.
Publicado: (2007) -
The installation and bakeout shell of ALICE's central beryllium beam pipe and absorber beam pipe, running through the middle of the Inner Tracker System (ITS) and Time Projection Chamber (TPC)
Publicado: (2007) -
Installation of the CMS beam pipe.
Publicado: (2008) -
Saturation behaviour of the LHC NEG coated beam pipes
por: Porcelli, T, et al.
Publicado: (2012) -
A glimpse inside the sophisticated solenoid magnet of the Common Muon Proton Apparatus for Structure and Spectroscopy (COMPASS)
por: COMPASS team
Publicado: (2006)