Cargando…
Completion of installation of DT and RPC chambers before Cosmic Challenge
All the drift tube ("DT") and resistive plate chambers ("RPC") packages foreseen to be installed in the central barrel ring ("YB0") before the magnet test have been installed (some are missing in the photograph but have since been installed). These silver-coloured recta...
Autor principal: | |
---|---|
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/938512 |
_version_ | 1780909709581090816 |
---|---|
author | Mimmo Dattola |
author_facet | Mimmo Dattola |
author_sort | Mimmo Dattola |
collection | CERN |
description | All the drift tube ("DT") and resistive plate chambers ("RPC") packages foreseen to be installed in the central barrel ring ("YB0") before the magnet test have been installed (some are missing in the photograph but have since been installed). These silver-coloured rectangular boxes in the gaps between the steel of the rings (red in the image) detect muons. Chambers for Sectors 4 and 5 (sector 1 is at the 9 o'clock position and the counting is clockwise) as well as a couple of chambers in the support "feet" (sectors 9 and 11) will be installed after the magnet test. Chambers for sectors 1 and 7 will be installed in the underground cavern ("UXC") - the latter will be in the places used for the lifting and lowering of the ring. |
id | cern-938512 |
institution | Organización Europea para la Investigación Nuclear |
publishDate | 2006 |
record_format | invenio |
spelling | cern-9385122019-09-30T06:29:59Zhttp://cds.cern.ch/record/938512Mimmo DattolaCompletion of installation of DT and RPC chambers before Cosmic ChallengeOUTREACHMuon DetectorAll the drift tube ("DT") and resistive plate chambers ("RPC") packages foreseen to be installed in the central barrel ring ("YB0") before the magnet test have been installed (some are missing in the photograph but have since been installed). These silver-coloured rectangular boxes in the gaps between the steel of the rings (red in the image) detect muons. Chambers for Sectors 4 and 5 (sector 1 is at the 9 o'clock position and the counting is clockwise) as well as a couple of chambers in the support "feet" (sectors 9 and 11) will be installed after the magnet test. Chambers for sectors 1 and 7 will be installed in the underground cavern ("UXC") - the latter will be in the places used for the lifting and lowering of the ring.CMS-PHO-OREACH-2006-009oai:cds.cern.ch:9385122006-02-17 |
spellingShingle | OUTREACH Muon Detector Mimmo Dattola Completion of installation of DT and RPC chambers before Cosmic Challenge |
title | Completion of installation of DT and RPC chambers before Cosmic Challenge |
title_full | Completion of installation of DT and RPC chambers before Cosmic Challenge |
title_fullStr | Completion of installation of DT and RPC chambers before Cosmic Challenge |
title_full_unstemmed | Completion of installation of DT and RPC chambers before Cosmic Challenge |
title_short | Completion of installation of DT and RPC chambers before Cosmic Challenge |
title_sort | completion of installation of dt and rpc chambers before cosmic challenge |
topic | OUTREACH Muon Detector |
url | http://cds.cern.ch/record/938512 |
work_keys_str_mv | AT mimmodattola completionofinstallationofdtandrpcchambersbeforecosmicchallenge |