Completion of installation of DT and RPC chambers before Cosmic Challenge
All the drift tube ("DT") and resistive plate chambers ("RPC") packages foreseen to be installed in the central barrel ring ("YB0") before the magnet test have been installed (some are missing in the photograph but have since been installed). These silver-coloured recta...
Autor principal: | Mimmo Dattola |
---|---|
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/938512 |
Ejemplares similares
-
First DT+RPC chambers installation round in the UX5 cavern
por: Jesus Puerta-Pelayo
Publicado: (2007) -
First installation of DT and RPC packages into the CMS iron yoke
por: Jesus Puerta-Pelayo
Publicado: (2004) -
Commissioning activities of CMS Drift Tubes (DT) chambers at SX5
por: Domenico Dattola
Publicado: (2005) -
First joint test beam of CMS Drift Tubes (DT) and Resistive Plate Chambers (RPC)
por: Paolo Giacomelli
Publicado: (2001) -
Installation of last DT+RPC packages for the muon barrel detector of CMS
por: Jesus Puerta-Pelayo
Publicado: (2007)