Cargando…
Construction status of the CMS barrel on September 2002 and March 2003 (last picture)
The pictures show the status of the CMS construction on September 2002, with the coil and the return yoke being assembled. The last picture has been taken on March 2003 and shows the "nacelle" ("cherry_picker") mounting at P5.
Autores principales: | , |
---|---|
Publicado: |
2002
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/938517 |
_version_ | 1780909710454554624 |
---|---|
author | Richard Breedon Igor Vorobiev |
author_facet | Richard Breedon Igor Vorobiev |
author_sort | Richard Breedon |
collection | CERN |
description | The pictures show the status of the CMS construction on September 2002, with the coil and the return yoke being assembled. The last picture has been taken on March 2003 and shows the "nacelle" ("cherry_picker") mounting at P5. |
id | cern-938517 |
institution | Organización Europea para la Investigación Nuclear |
publishDate | 2002 |
record_format | invenio |
spelling | cern-9385172019-09-30T06:29:59Zhttp://cds.cern.ch/record/938517Richard BreedonIgor VorobievConstruction status of the CMS barrel on September 2002 and March 2003 (last picture)OUTREACHThe pictures show the status of the CMS construction on September 2002, with the coil and the return yoke being assembled. The last picture has been taken on March 2003 and shows the "nacelle" ("cherry_picker") mounting at P5.CMS-PHO-OREACH-2002-001oai:cds.cern.ch:9385172002-09-06 |
spellingShingle | OUTREACH Richard Breedon Igor Vorobiev Construction status of the CMS barrel on September 2002 and March 2003 (last picture) |
title | Construction status of the CMS barrel on September 2002 and March 2003 (last picture) |
title_full | Construction status of the CMS barrel on September 2002 and March 2003 (last picture) |
title_fullStr | Construction status of the CMS barrel on September 2002 and March 2003 (last picture) |
title_full_unstemmed | Construction status of the CMS barrel on September 2002 and March 2003 (last picture) |
title_short | Construction status of the CMS barrel on September 2002 and March 2003 (last picture) |
title_sort | construction status of the cms barrel on september 2002 and march 2003 (last picture) |
topic | OUTREACH |
url | http://cds.cern.ch/record/938517 |
work_keys_str_mv | AT richardbreedon constructionstatusofthecmsbarrelonseptember2002andmarch2003lastpicture AT igorvorobiev constructionstatusofthecmsbarrelonseptember2002andmarch2003lastpicture |