Cargando…
Construction status of the CMS barrel on September 2002 and March 2003 (last picture)
The pictures show the status of the CMS construction on September 2002, with the coil and the return yoke being assembled. The last picture has been taken on March 2003 and shows the "nacelle" ("cherry_picker") mounting at P5.
Autores principales: | Richard Breedon, Igor Vorobiev |
---|---|
Publicado: |
2002
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/938517 |
Ejemplares similares
-
Insertion of the CMS coil into the barrel yoke on 14 September 2005
por: Maximilien Brice
Publicado: (2005) -
CMS - March 2002 - June 2002 - September 2002
por: CERN. Geneva
Publicado: (2002) -
First two barrel ECAL supermodules inserted in CMS HCAL
por: K.Bell
Publicado: (2006) -
First half-barrel of the CMS hadron calorimeter successfully asembled
Publicado: (2001) -
Installation of CMS EB (ECAL Barrel) Supermodules 5 and 13 inside HB+ (HCAL Barrel) on 26/27 April 2006
por: Ken Bell, RAL, et al.
Publicado: (2006)