Cargando…
TIB Layer 4 being assembled and cabled in Pisa
A picture of one half of Layer 4 assembled and cabled in Pisa
Autor principal: | Roberto dell'Orso |
---|---|
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/943267 |
Ejemplares similares
-
Second half of the Inner Tracker (TIB+TID) ready for assembling in Pisa before transportation to CERN
por: Franco Ligabue
Publicado: (2006) -
Prototype of the barrel MSGC 'rod' with three modules, cables, gas and cooling
Publicado: (1997) -
CMS tracker, full scale mockup. Cable storage during tracker installation
por: Horst Breuker
Publicado: (1999) -
First sector of TEC+ integrated at the integration facility in Aachen. Now being readout and debugged.
Publicado: (2006) -
Overview of CMS robotic silicon module assembly hardware based on Aerotech Gantry Positioning system.
por: Honma, Alan
Publicado: (1999)