Commissioning activities of CMS Drift Tubes (DT) chambers at SX5
After DT and RPC packages have been installed, and before their cabling, single chamber commissioning takes place. It consists of a series of performance test on the on-chamber minicrates, containing readout and trigger electronics, as well as high voltage tests and cosmic data taking. The pictures...
Autor principal: | |
---|---|
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/943664 |
Sumario: | After DT and RPC packages have been installed, and before their cabling, single chamber commissioning takes place. It consists of a series of performance test on the on-chamber minicrates, containing readout and trigger electronics, as well as high voltage tests and cosmic data taking. The pictures show the preparation activities for the chamber commissioning in the construction hall in Cessy (neighbouring France), called SX5. |
---|