Commissioning activities of CMS Drift Tubes (DT) chambers at SX5

After DT and RPC packages have been installed, and before their cabling, single chamber commissioning takes place. It consists of a series of performance test on the on-chamber minicrates, containing readout and trigger electronics, as well as high voltage tests and cosmic data taking. The pictures...

Descripción completa

Detalles Bibliográficos
Autor principal: Domenico Dattola
Publicado: 2005
Materias:
Acceso en línea:http://cds.cern.ch/record/943664
Descripción
Sumario:After DT and RPC packages have been installed, and before their cabling, single chamber commissioning takes place. It consists of a series of performance test on the on-chamber minicrates, containing readout and trigger electronics, as well as high voltage tests and cosmic data taking. The pictures show the preparation activities for the chamber commissioning in the construction hall in Cessy (neighbouring France), called SX5.