Commissioning activities of CMS Drift Tubes (DT) chambers at SX5
After DT and RPC packages have been installed, and before their cabling, single chamber commissioning takes place. It consists of a series of performance test on the on-chamber minicrates, containing readout and trigger electronics, as well as high voltage tests and cosmic data taking. The pictures...
Autor principal: | Domenico Dattola |
---|---|
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/943664 |
Ejemplares similares
-
Assembly of Drift Tubes (DT) Chambers at CIEMAT (Madrid)
por: Jesus Puerta-Pelayo
Publicado: (2003) -
Images of CMS Muons - Drift Tubes (DT)
por: Puerta-Pelayo, J, et al.
Publicado: (2008) -
First joint test beam of CMS Drift Tubes (DT) and Resistive Plate Chambers (RPC)
por: Paolo Giacomelli
Publicado: (2001) -
Completion of installation of DT and RPC chambers before Cosmic Challenge
por: Mimmo Dattola
Publicado: (2006) -
First tests of DT insertion in SX5.
por: Massimo Benettoni
Publicado: (2002)