Cargando…

First installation of DT and RPC packages into the CMS iron yoke

These pictures illustrate the installation process of muon barrel packages (DT + RPC) into the pockets of the CMS iron yoke at SX5. The chambers are first transported in groups of four from the ISR area (where they are certified and coupled together) to the construction hall in Cessy (neighbouring F...

Descripción completa

Detalles Bibliográficos
Autor principal: Jesus Puerta-Pelayo
Publicado: 2004
Materias:
Acceso en línea:http://cds.cern.ch/record/943666
Descripción
Sumario:These pictures illustrate the installation process of muon barrel packages (DT + RPC) into the pockets of the CMS iron yoke at SX5. The chambers are first transported in groups of four from the ISR area (where they are certified and coupled together) to the construction hall in Cessy (neighbouring France), called Point 5 (or SX5). Once there, they pass through a fast high voltage and electronic certification test, before being slid into the insertion cradle. This cradle is attached to the yoke and aligned to the chamber rails, allowing an easy insertion. A rate of 3 chambers per day can be achieved. This set of pictures was taken during the first final insertion round at Point 5, where most chambers for the lower part of YB+2 were installed.