Cargando…
First installation of DT and RPC packages into the CMS iron yoke
These pictures illustrate the installation process of muon barrel packages (DT + RPC) into the pockets of the CMS iron yoke at SX5. The chambers are first transported in groups of four from the ISR area (where they are certified and coupled together) to the construction hall in Cessy (neighbouring F...
Autor principal: | Jesus Puerta-Pelayo |
---|---|
Publicado: |
2004
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/943666 |
Ejemplares similares
-
First DT+RPC chambers installation round in the UX5 cavern
por: Jesus Puerta-Pelayo
Publicado: (2007) -
Installation of last DT+RPC packages for the muon barrel detector of CMS
por: Jesus Puerta-Pelayo
Publicado: (2007) -
Completion of installation of DT and RPC chambers before Cosmic Challenge
por: Mimmo Dattola
Publicado: (2006) -
First joint test beam of CMS Drift Tubes (DT) and Resistive Plate Chambers (RPC)
por: Paolo Giacomelli
Publicado: (2001) -
CMS RPC detectors assembled in Pakistan installed on the backside of the YE+1 endcap yoke
por: Walter Van Doninck, VUB-Brussels and CERN
Publicado: (2006)