Cargando…
Production of CMS-ECAL supermodules
CMS electromagnetic calorimeter (ECAL) electronics integration centre working on 4 barrel supermodules in parallel (end of Feb. 2006): While SM21 (red) and SM19 (green) are processed, SM13 (white) is being repaired and re-tested and SM17 (blue) is being commissioned for one week. More than 2/3 of th...
Autores principales: | , , |
---|---|
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/944770 |
Sumario: | CMS electromagnetic calorimeter (ECAL) electronics integration centre working on 4 barrel supermodules in parallel (end of Feb. 2006): While SM21 (red) and SM19 (green) are processed, SM13 (white) is being repaired and re-tested and SM17 (blue) is being commissioned for one week. More than 2/3 of the barrel supermodules are now ready for the integration of the electronics. Pictures 2-6 have been taken in the electronics integration centre in May 2005. Picture 7 shows the "petrified forest" on a sumermodule. |
---|