Cargando…
Q-Measurement during the run 26 May, 1976
Autor principal: | Mills, P |
---|---|
Lenguaje: | eng |
Publicado: |
1976
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/944984 |
Ejemplares similares
-
RF Tean Report on the Run of 25 - 26 May, 1976
por: Linnecar, Trevor Paul R
Publicado: (1976) -
Run 716 - 4 May 1976, Ring 1 - 26 GeV/c, Coupling measurements with the low-B insertion
por: Gourber, J P
Publicado: (1976) -
Run 724 - 24 May 1976, Ring 2 - 26 GeV/c, Test of the magnetic beam detector
por: Gourber, J P, et al.
Publicado: (1976) -
Run 728, 31st May 1976, 26 GeV 8C working line with 50 MHz feedback, Run 731, 1-4th June 1976, Test of prototype system for measuring clearing currents
por: Gröbner, Oswald, et al.
Publicado: (1976) -
Run 772 - 8.11.1976, Run 776 - 19.11.1976, Run 779 - 22.11.1976, Rings 1 and 2 - 26 GeV/c, Tests of the low-B insertion in I1
por: Brand, K, et al.
Publicado: (1977)