Installation of CMS EB (ECAL Barrel) Supermodules 5 and 13 inside HB+ (HCAL Barrel) on 26/27 April 2006

The first two barrel "supermodules" of the CMS Electromagnetic Calorimeter (ECAL) have been inserted into the barrel hadron calorimeter (HCAL) in the CMS experimental hall (called SX5) in Cessy in preparation for the forthcoming magnet test and cosmic challenge (MTCC). Each of the two supe...

Descripción completa

Detalles Bibliográficos
Autores principales: Ken Bell, RAL, Zhihong Sun, CEA-Saclay
Publicado: 2006
Materias:
Acceso en línea:http://cds.cern.ch/record/946732
_version_ 1780909920440287232
author Ken Bell, RAL
Zhihong Sun, CEA-Saclay
author_facet Ken Bell, RAL
Zhihong Sun, CEA-Saclay
author_sort Ken Bell, RAL
collection CERN
description The first two barrel "supermodules" of the CMS Electromagnetic Calorimeter (ECAL) have been inserted into the barrel hadron calorimeter (HCAL) in the CMS experimental hall (called SX5) in Cessy in preparation for the forthcoming magnet test and cosmic challenge (MTCC). Each of the two supermodules contains 1700 lead tungstate crystals in glass-fibre alveolar support structures, with associated avalanche photodiodes (APDs, for scintillation light detection), electronics and cooling system. See also the document CMS-PHO-OREACH-2006-019. The first two pictures show the two supermodules in their final position. Fig. 3: the "enfourneur" in position on the HB Cradle. Fig. 4: supermodule n. 5 and extension rails being lifted to the enforneur. Figs. 5-6: supermodule approaching the enforneur. Fig. 7: rotating the Enfourneur to the correct phi direction Figs. 8-9: aligning the extension rails with the rails inside HB and view from inside HB, once the rails are aligned. Figs. 10-12: insertion of supermodule n. 5. Fig. 13: supermodule 13 being inserted: will they touch? Fig. 14: they are finally in position. Fig. 15: view of the two supermodules with both halves of HB, plus the HE and dummy EE/ES in the distance. Fig. 16: view of the two supermodules, from the negative side of barrel yoke YB0
id cern-946732
institution Organización Europea para la Investigación Nuclear
publishDate 2006
record_format invenio
spelling cern-9467322019-09-30T06:29:59Zhttp://cds.cern.ch/record/946732Ken Bell, RALZhihong Sun, CEA-SaclayInstallation of CMS EB (ECAL Barrel) Supermodules 5 and 13 inside HB+ (HCAL Barrel) on 26/27 April 2006OUTREACHThe first two barrel "supermodules" of the CMS Electromagnetic Calorimeter (ECAL) have been inserted into the barrel hadron calorimeter (HCAL) in the CMS experimental hall (called SX5) in Cessy in preparation for the forthcoming magnet test and cosmic challenge (MTCC). Each of the two supermodules contains 1700 lead tungstate crystals in glass-fibre alveolar support structures, with associated avalanche photodiodes (APDs, for scintillation light detection), electronics and cooling system. See also the document CMS-PHO-OREACH-2006-019. The first two pictures show the two supermodules in their final position. Fig. 3: the "enfourneur" in position on the HB Cradle. Fig. 4: supermodule n. 5 and extension rails being lifted to the enforneur. Figs. 5-6: supermodule approaching the enforneur. Fig. 7: rotating the Enfourneur to the correct phi direction Figs. 8-9: aligning the extension rails with the rails inside HB and view from inside HB, once the rails are aligned. Figs. 10-12: insertion of supermodule n. 5. Fig. 13: supermodule 13 being inserted: will they touch? Fig. 14: they are finally in position. Fig. 15: view of the two supermodules with both halves of HB, plus the HE and dummy EE/ES in the distance. Fig. 16: view of the two supermodules, from the negative side of barrel yoke YB0CMS-PHO-OREACH-2006-020oai:cds.cern.ch:9467322006-04-27
spellingShingle OUTREACH
Ken Bell, RAL
Zhihong Sun, CEA-Saclay
Installation of CMS EB (ECAL Barrel) Supermodules 5 and 13 inside HB+ (HCAL Barrel) on 26/27 April 2006
title Installation of CMS EB (ECAL Barrel) Supermodules 5 and 13 inside HB+ (HCAL Barrel) on 26/27 April 2006
title_full Installation of CMS EB (ECAL Barrel) Supermodules 5 and 13 inside HB+ (HCAL Barrel) on 26/27 April 2006
title_fullStr Installation of CMS EB (ECAL Barrel) Supermodules 5 and 13 inside HB+ (HCAL Barrel) on 26/27 April 2006
title_full_unstemmed Installation of CMS EB (ECAL Barrel) Supermodules 5 and 13 inside HB+ (HCAL Barrel) on 26/27 April 2006
title_short Installation of CMS EB (ECAL Barrel) Supermodules 5 and 13 inside HB+ (HCAL Barrel) on 26/27 April 2006
title_sort installation of cms eb (ecal barrel) supermodules 5 and 13 inside hb+ (hcal barrel) on 26/27 april 2006
topic OUTREACH
url http://cds.cern.ch/record/946732
work_keys_str_mv AT kenbellral installationofcmsebecalbarrelsupermodules5and13insidehbhcalbarrelon2627april2006
AT zhihongsunceasaclay installationofcmsebecalbarrelsupermodules5and13insidehbhcalbarrelon2627april2006