Cargando…
Magnet Test Setup of the CMS Tracker ready for installation
The pieces of the Tracker that will be operated in the forthcoming Magnet Test and Cosmic Challenge (MTCC) have been transported inside the dummy tracker support tube to the CMS experimental hall (Point 5, Cessy). The operation took place during the night of 12th May, covering the ~15km distance in...
Autor principal: | |
---|---|
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/950801 |
_version_ | 1780909965569949696 |
---|---|
author | Maximilien Brice |
author_facet | Maximilien Brice |
author_sort | Maximilien Brice |
collection | CERN |
description | The pieces of the Tracker that will be operated in the forthcoming Magnet Test and Cosmic Challenge (MTCC) have been transported inside the dummy tracker support tube to the CMS experimental hall (Point 5, Cessy). The operation took place during the night of 12th May, covering the ~15km distance in about three hours. The transport was monitored for shocks, temperature and humidity with the help of the CERN TS-IC section. The Tracker setup comprises segments of the Tracker Inner Barrel (TIB), the Tracker Outer Barrel (TOB) and Tracker EndCaps (TEC) detectors. It represents roughly 1% of the final CMS Tracker. Installation into the solenoid is foreseen to take place on Wednesday 17th May. |
id | cern-950801 |
institution | Organización Europea para la Investigación Nuclear |
publishDate | 2006 |
record_format | invenio |
spelling | cern-9508012019-09-30T06:29:59Zhttp://cds.cern.ch/record/950801Maximilien BriceMagnet Test Setup of the CMS Tracker ready for installationOUTREACHThe pieces of the Tracker that will be operated in the forthcoming Magnet Test and Cosmic Challenge (MTCC) have been transported inside the dummy tracker support tube to the CMS experimental hall (Point 5, Cessy). The operation took place during the night of 12th May, covering the ~15km distance in about three hours. The transport was monitored for shocks, temperature and humidity with the help of the CERN TS-IC section. The Tracker setup comprises segments of the Tracker Inner Barrel (TIB), the Tracker Outer Barrel (TOB) and Tracker EndCaps (TEC) detectors. It represents roughly 1% of the final CMS Tracker. Installation into the solenoid is foreseen to take place on Wednesday 17th May.CMS-PHO-OREACH-2006-023oai:cds.cern.ch:9508012006-05-12 |
spellingShingle | OUTREACH Maximilien Brice Magnet Test Setup of the CMS Tracker ready for installation |
title | Magnet Test Setup of the CMS Tracker ready for installation |
title_full | Magnet Test Setup of the CMS Tracker ready for installation |
title_fullStr | Magnet Test Setup of the CMS Tracker ready for installation |
title_full_unstemmed | Magnet Test Setup of the CMS Tracker ready for installation |
title_short | Magnet Test Setup of the CMS Tracker ready for installation |
title_sort | magnet test setup of the cms tracker ready for installation |
topic | OUTREACH |
url | http://cds.cern.ch/record/950801 |
work_keys_str_mv | AT maximilienbrice magnettestsetupofthecmstrackerreadyforinstallation |