Cargando…

Magnet Test Setup of the CMS Tracker ready for installation

The pieces of the Tracker that will be operated in the forthcoming Magnet Test and Cosmic Challenge (MTCC) have been transported inside the dummy tracker support tube to the CMS experimental hall (Point 5, Cessy). The operation took place during the night of 12th May, covering the ~15km distance in...

Descripción completa

Detalles Bibliográficos
Autor principal: Maximilien Brice
Publicado: 2006
Materias:
Acceso en línea:http://cds.cern.ch/record/950801
_version_ 1780909965569949696
author Maximilien Brice
author_facet Maximilien Brice
author_sort Maximilien Brice
collection CERN
description The pieces of the Tracker that will be operated in the forthcoming Magnet Test and Cosmic Challenge (MTCC) have been transported inside the dummy tracker support tube to the CMS experimental hall (Point 5, Cessy). The operation took place during the night of 12th May, covering the ~15km distance in about three hours. The transport was monitored for shocks, temperature and humidity with the help of the CERN TS-IC section. The Tracker setup comprises segments of the Tracker Inner Barrel (TIB), the Tracker Outer Barrel (TOB) and Tracker EndCaps (TEC) detectors. It represents roughly 1% of the final CMS Tracker. Installation into the solenoid is foreseen to take place on Wednesday 17th May.
id cern-950801
institution Organización Europea para la Investigación Nuclear
publishDate 2006
record_format invenio
spelling cern-9508012019-09-30T06:29:59Zhttp://cds.cern.ch/record/950801Maximilien BriceMagnet Test Setup of the CMS Tracker ready for installationOUTREACHThe pieces of the Tracker that will be operated in the forthcoming Magnet Test and Cosmic Challenge (MTCC) have been transported inside the dummy tracker support tube to the CMS experimental hall (Point 5, Cessy). The operation took place during the night of 12th May, covering the ~15km distance in about three hours. The transport was monitored for shocks, temperature and humidity with the help of the CERN TS-IC section. The Tracker setup comprises segments of the Tracker Inner Barrel (TIB), the Tracker Outer Barrel (TOB) and Tracker EndCaps (TEC) detectors. It represents roughly 1% of the final CMS Tracker. Installation into the solenoid is foreseen to take place on Wednesday 17th May.CMS-PHO-OREACH-2006-023oai:cds.cern.ch:9508012006-05-12
spellingShingle OUTREACH
Maximilien Brice
Magnet Test Setup of the CMS Tracker ready for installation
title Magnet Test Setup of the CMS Tracker ready for installation
title_full Magnet Test Setup of the CMS Tracker ready for installation
title_fullStr Magnet Test Setup of the CMS Tracker ready for installation
title_full_unstemmed Magnet Test Setup of the CMS Tracker ready for installation
title_short Magnet Test Setup of the CMS Tracker ready for installation
title_sort magnet test setup of the cms tracker ready for installation
topic OUTREACH
url http://cds.cern.ch/record/950801
work_keys_str_mv AT maximilienbrice magnettestsetupofthecmstrackerreadyforinstallation