Cargando…

Acceleration Cycles for the LHC Proton Beam in the SPS

A magnetic cycle for the SPS, having a shorter acceleration time than that used at present for the nominal LHC beam cycle, has been designed. This cycle consists of 7 different parts, all described by parabolas, satisfying different criteria coming from the voltage and power limitations in the main...

Descripción completa

Detalles Bibliográficos
Autores principales: Arduini, Gianluigi, Shaposhnikova, Elena, Wenninger, J
Lenguaje:eng
Publicado: 2006
Materias:
Acceso en línea:http://cds.cern.ch/record/951985
_version_ 1780909993888841728
author Arduini, Gianluigi
Shaposhnikova, Elena
Wenninger, J
author_facet Arduini, Gianluigi
Shaposhnikova, Elena
Wenninger, J
author_sort Arduini, Gianluigi
collection CERN
description A magnetic cycle for the SPS, having a shorter acceleration time than that used at present for the nominal LHC beam cycle, has been designed. This cycle consists of 7 different parts, all described by parabolas, satisfying different criteria coming from the voltage and power limitations in the main dipoles and 200 MHz RF system, as well as from beam dynamics considerations. We plan to test this cyle in 2006 first with the LHC pilot beam, for which the cycle length will be 33% less than the present 10.8 s long cycle. With LHC in operation, this should increase the available flux of protons to other SPS users. Later the possibility of using this cycle for higher intensity beam should also be verified experimentally. The expected reduction of the LHC filling time is 15%.
id cern-951985
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2006
record_format invenio
spelling cern-9519852019-09-30T06:29:59Zhttp://cds.cern.ch/record/951985engArduini, GianluigiShaposhnikova, ElenaWenninger, JAcceleration Cycles for the LHC Proton Beam in the SPSAccelerators and Storage RingsA magnetic cycle for the SPS, having a shorter acceleration time than that used at present for the nominal LHC beam cycle, has been designed. This cycle consists of 7 different parts, all described by parabolas, satisfying different criteria coming from the voltage and power limitations in the main dipoles and 200 MHz RF system, as well as from beam dynamics considerations. We plan to test this cyle in 2006 first with the LHC pilot beam, for which the cycle length will be 33% less than the present 10.8 s long cycle. With LHC in operation, this should increase the available flux of protons to other SPS users. Later the possibility of using this cycle for higher intensity beam should also be verified experimentally. The expected reduction of the LHC filling time is 15%.AB-Note-2006-018-RFCERN-AB-Note-2006-018-RFoai:cds.cern.ch:9519852006-06-13
spellingShingle Accelerators and Storage Rings
Arduini, Gianluigi
Shaposhnikova, Elena
Wenninger, J
Acceleration Cycles for the LHC Proton Beam in the SPS
title Acceleration Cycles for the LHC Proton Beam in the SPS
title_full Acceleration Cycles for the LHC Proton Beam in the SPS
title_fullStr Acceleration Cycles for the LHC Proton Beam in the SPS
title_full_unstemmed Acceleration Cycles for the LHC Proton Beam in the SPS
title_short Acceleration Cycles for the LHC Proton Beam in the SPS
title_sort acceleration cycles for the lhc proton beam in the sps
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/951985
work_keys_str_mv AT arduinigianluigi accelerationcyclesforthelhcprotonbeaminthesps
AT shaposhnikovaelena accelerationcyclesforthelhcprotonbeaminthesps
AT wenningerj accelerationcyclesforthelhcprotonbeaminthesps