The Wiring of 30,000 MDT-BIS tubes at the University of Athens

This note describes the wiring of 30,000 Monitored Drift Tubes at the assembly line of the University of Athens. The necessary tooling together with the procedure followed for the wiring is briefly presented. Experience and results of the wiring performance together with the quality assurance are gi...

Descripción completa

Detalles Bibliográficos
Autores principales: Fassouliotis, D, Ioannou, P, Kourkoumelis, C
Lenguaje:eng
Publicado: 2006
Materias:
Acceso en línea:http://cds.cern.ch/record/954649
Descripción
Sumario:This note describes the wiring of 30,000 Monitored Drift Tubes at the assembly line of the University of Athens. The necessary tooling together with the procedure followed for the wiring is briefly presented. Experience and results of the wiring performance together with the quality assurance are given for the total number of 30,000 tubes, used for the assembly of 112 ATLAS Barrel Muon chambers.