Cargando…
The Wiring of 30,000 MDT-BIS tubes at the University of Athens
This note describes the wiring of 30,000 Monitored Drift Tubes at the assembly line of the University of Athens. The necessary tooling together with the procedure followed for the wiring is briefly presented. Experience and results of the wiring performance together with the quality assurance are gi...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/954649 |
Sumario: | This note describes the wiring of 30,000 Monitored Drift Tubes at the assembly line of the University of Athens. The necessary tooling together with the procedure followed for the wiring is briefly presented. Experience and results of the wiring performance together with the quality assurance are given for the total number of 30,000 tubes, used for the assembly of 112 ATLAS Barrel Muon chambers. |
---|