Cargando…

Design and Tests of a Low-Loss Multi-Turn Ejector for the CERN PS

Following the positive results of a three-year measurement campaign at the CERN Proton Synchrotron, a study of a possible implementation of the proposed Multi-Turn Extraction (MTE) based on beam splitting with stable islands in the transverse phase space was undertaken. A substantial reduction of be...

Descripción completa

Detalles Bibliográficos
Autor principal: Giovannozzi, Massimo
Lenguaje:eng
Publicado: 2006
Materias:
Acceso en línea:http://cds.cern.ch/record/967145
_version_ 1780910430072340480
author Giovannozzi, Massimo
author_facet Giovannozzi, Massimo
author_sort Giovannozzi, Massimo
collection CERN
description Following the positive results of a three-year measurement campaign at the CERN Proton Synchrotron, a study of a possible implementation of the proposed Multi-Turn Extraction (MTE) based on beam splitting with stable islands in the transverse phase space was undertaken. A substantial reduction of beam losses, with respect to the present extraction scheme, could be achieved with the proposed technique when delivering the high-intensity proton beams required for the planned CERN Neutrino to Gran Sasso Project. Major modifications to the ring layout are needed, such as a new design of the extraction bumps including also the installation of three additional kickers to create a closed-bump over the five turns used to extract the split beam. The ring aperture was reviewed and improvements are proposed to reduce possible beam losses between beam splitting and extraction. The goal is to implement the proposed changes by beginning of 2008 and to commission the novel extraction during the 2008 PS physics run.
id cern-967145
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2006
record_format invenio
spelling cern-9671452019-09-30T06:29:59Zhttp://cds.cern.ch/record/967145engGiovannozzi, MassimoDesign and Tests of a Low-Loss Multi-Turn Ejector for the CERN PSAccelerators and Storage RingsFollowing the positive results of a three-year measurement campaign at the CERN Proton Synchrotron, a study of a possible implementation of the proposed Multi-Turn Extraction (MTE) based on beam splitting with stable islands in the transverse phase space was undertaken. A substantial reduction of beam losses, with respect to the present extraction scheme, could be achieved with the proposed technique when delivering the high-intensity proton beams required for the planned CERN Neutrino to Gran Sasso Project. Major modifications to the ring layout are needed, such as a new design of the extraction bumps including also the installation of three additional kickers to create a closed-bump over the five turns used to extract the split beam. The ring aperture was reviewed and improvements are proposed to reduce possible beam losses between beam splitting and extraction. The goal is to implement the proposed changes by beginning of 2008 and to commission the novel extraction during the 2008 PS physics run.CERN-AB-2006-021oai:cds.cern.ch:9671452006-05-24
spellingShingle Accelerators and Storage Rings
Giovannozzi, Massimo
Design and Tests of a Low-Loss Multi-Turn Ejector for the CERN PS
title Design and Tests of a Low-Loss Multi-Turn Ejector for the CERN PS
title_full Design and Tests of a Low-Loss Multi-Turn Ejector for the CERN PS
title_fullStr Design and Tests of a Low-Loss Multi-Turn Ejector for the CERN PS
title_full_unstemmed Design and Tests of a Low-Loss Multi-Turn Ejector for the CERN PS
title_short Design and Tests of a Low-Loss Multi-Turn Ejector for the CERN PS
title_sort design and tests of a low-loss multi-turn ejector for the cern ps
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/967145
work_keys_str_mv AT giovannozzimassimo designandtestsofalowlossmultiturnejectorforthecernps