Cargando…

THE INITIAL COOLING EXPERIMENT (ICE)

<!--HTML-->ICE was built during 1977, in a record time of 9 months, using the modified bending magnets of the g-2 muon storage ring (see <a href="http://cdsweb.cern.ch/record/726710">7405430</a>). ICE was a proton and antiproton storage ring, built to verify the validity...

Descripción completa

Detalles Bibliográficos
Autor principal: CERN PhotoLab
Publicado: 1977
Materias:
Acceso en línea:http://cds.cern.ch/record/969132
Descripción
Sumario:<!--HTML-->ICE was built during 1977, in a record time of 9 months, using the modified bending magnets of the g-2 muon storage ring (see <a href="http://cdsweb.cern.ch/record/726710">7405430</a>). ICE was a proton and antiproton storage ring, built to verify the validity of stochastic and electron cooling for the antiproton project to be launched in 1978. More on the ICE experimental programme with <a href="http://cdsweb.cern.ch/record/615855">7802099</a>. See also <a href="http://cdsweb.cern.ch/record/969209">7809081</a>, <a href="http://cdsweb.cern.ch/record/969430">7908242</a>.