Cargando…

Beam lines from Linac 1 and Linac 2 to the Booster

View against the direction of the beams. Both Linacs are behind the concrete wall at the back of the picture. The 50 MeV proton beam from Linac 1 enters the PS tunnel through the hole at left. The line from Linac 2, in the process of being installed, comes from the hole at right. The lines converge...

Descripción completa

Detalles Bibliográficos
Autor principal: CERN PhotoLab
Publicado: 1978
Materias:
Acceso en línea:http://cds.cern.ch/record/969146

Ejemplares similares