Initial Cooling Experiment (ICE)

<!--HTML-->ICE was built in 1977, in a record time of 9 months, using the modified bending magnets of the g-2 muon storage ring. Its purpose was to verify the validity of stochastic and electron cooling for the antiproton project, to be launched in 1978. Already early in 1978, stochastic cooli...

Descripción completa

Detalles Bibliográficos
Autor principal: CERN PhotoLab
Publicado: 1978
Materias:
Acceso en línea:http://cds.cern.ch/record/969209
_version_ 1780910533825789952
author CERN PhotoLab
author_facet CERN PhotoLab
author_sort CERN PhotoLab
collection CERN
description <!--HTML-->ICE was built in 1977, in a record time of 9 months, using the modified bending magnets of the g-2 muon storage ring. Its purpose was to verify the validity of stochastic and electron cooling for the antiproton project, to be launched in 1978. Already early in 1978, stochastic cooling proved a resounding success, such that the antiproton (p-pbar)project was entirely based on it. Tests of electron cooling followed later: protons of 46 MeV kinetic energy were cooled with an electron beam of 26 kV and 1.3 A. The cage seen prominently in the foreground houses the HV equipment, adjacent to the "cooler" installed in a straight section of the ring. With some modifications, the cooler was later transplanted into LEAR (Low Energy Antiproton Ring) and then, with further modifications, into the AD (Antiproton Decelerator), where it cools antiprotons to this day (2006). See also: <a href="http://cdsweb.cern.ch/record/969132">7711282</a>, <a href="http://cdsweb.cern.ch/record/615855">7802099</a>, <a href="http://cdsweb.cern.ch/record/969430">7908242</a>.
id cern-969209
institution Organización Europea para la Investigación Nuclear
publishDate 1978
record_format invenio
spelling cern-9692092019-09-30T06:29:59Zhttp://cds.cern.ch/record/969209CERN PhotoLabInitial Cooling Experiment (ICE)No Category<!--HTML-->ICE was built in 1977, in a record time of 9 months, using the modified bending magnets of the g-2 muon storage ring. Its purpose was to verify the validity of stochastic and electron cooling for the antiproton project, to be launched in 1978. Already early in 1978, stochastic cooling proved a resounding success, such that the antiproton (p-pbar)project was entirely based on it. Tests of electron cooling followed later: protons of 46 MeV kinetic energy were cooled with an electron beam of 26 kV and 1.3 A. The cage seen prominently in the foreground houses the HV equipment, adjacent to the "cooler" installed in a straight section of the ring. With some modifications, the cooler was later transplanted into LEAR (Low Energy Antiproton Ring) and then, with further modifications, into the AD (Antiproton Decelerator), where it cools antiprotons to this day (2006). See also: <a href="http://cdsweb.cern.ch/record/969132">7711282</a>, <a href="http://cdsweb.cern.ch/record/615855">7802099</a>, <a href="http://cdsweb.cern.ch/record/969430">7908242</a>.CERN-PHOTO-7809081oai:cds.cern.ch:9692091978
spellingShingle No Category
CERN PhotoLab
Initial Cooling Experiment (ICE)
title Initial Cooling Experiment (ICE)
title_full Initial Cooling Experiment (ICE)
title_fullStr Initial Cooling Experiment (ICE)
title_full_unstemmed Initial Cooling Experiment (ICE)
title_short Initial Cooling Experiment (ICE)
title_sort initial cooling experiment (ice)
topic No Category
url http://cds.cern.ch/record/969209
work_keys_str_mv AT cernphotolab initialcoolingexperimentice