Cargando…
SPS RF Accelerating Cavity
This picture shows one of the 2 new cavities installed in 1978-1979. The main RF-system of the SPS comprises four cavities: two of 20 m length and two of 16.5 m length. They are all installed in one long straight section (LSS 3). These cavities are of the travelling-wave type operating at a centre f...
Publicado: |
1979
|
---|---|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/969305 |
_version_ | 1780910551521558528 |
---|---|
collection | CERN |
description | This picture shows one of the 2 new cavities installed in 1978-1979. The main RF-system of the SPS comprises four cavities: two of 20 m length and two of 16.5 m length. They are all installed in one long straight section (LSS 3). These cavities are of the travelling-wave type operating at a centre frequency of 200.2 MHz. They are wideband, filling time about 700 ns and untuned. The power amplifiers, using tetrodes are installed in a surface building 200 m from the cavities. Initially only two cavities were installed, a third cavity was installed in 1978 and a forth one in 1979. The number of power amplifiers was also increased: to the first 2 MW plant a second 2 MW plant was added and by end 1979 there were 8 500 kW units combined in pairs to feed each of the 4 cavities with up to about 1 MW RF power, resulting in a total accelerating voltage of about 8 MV. See also 7412016X, 7412017X, 7411048X |
id | cern-969305 |
institution | Organización Europea para la Investigación Nuclear |
publishDate | 1979 |
record_format | invenio |
spelling | cern-9693052020-08-31T11:19:21Zhttp://cds.cern.ch/record/969305SPS RF Accelerating CavityAccelerators and associated DevelopmentsThis picture shows one of the 2 new cavities installed in 1978-1979. The main RF-system of the SPS comprises four cavities: two of 20 m length and two of 16.5 m length. They are all installed in one long straight section (LSS 3). These cavities are of the travelling-wave type operating at a centre frequency of 200.2 MHz. They are wideband, filling time about 700 ns and untuned. The power amplifiers, using tetrodes are installed in a surface building 200 m from the cavities. Initially only two cavities were installed, a third cavity was installed in 1978 and a forth one in 1979. The number of power amplifiers was also increased: to the first 2 MW plant a second 2 MW plant was added and by end 1979 there were 8 500 kW units combined in pairs to feed each of the 4 cavities with up to about 1 MW RF power, resulting in a total accelerating voltage of about 8 MV. See also 7412016X, 7412017X, 7411048XCERN-PHOTO-7902734oai:cds.cern.ch:9693051979 |
spellingShingle | Accelerators and associated Developments SPS RF Accelerating Cavity |
title | SPS RF Accelerating Cavity |
title_full | SPS RF Accelerating Cavity |
title_fullStr | SPS RF Accelerating Cavity |
title_full_unstemmed | SPS RF Accelerating Cavity |
title_short | SPS RF Accelerating Cavity |
title_sort | sps rf accelerating cavity |
topic | Accelerators and associated Developments |
url | http://cds.cern.ch/record/969305 |