Cargando…
AA precooling pickup
The freshly injected antiprotons, while circulating on the injection orbit, were subjected to fast stochastic "precooling" for several seconds (in momentum and in the vertical plane). This precooling pickup is being readied by Gerard Laurent for installation in its tank. Precooling PUs and...
Autor principal: | |
---|---|
Publicado: |
1980
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/969536 |
_version_ | 1780910600008761344 |
---|---|
author | CERN PhotoLab |
author_facet | CERN PhotoLab |
author_sort | CERN PhotoLab |
collection | CERN |
description | The freshly injected antiprotons, while circulating on the injection orbit, were subjected to fast stochastic "precooling" for several seconds (in momentum and in the vertical plane). This precooling pickup is being readied by Gerard Laurent for installation in its tank. Precooling PUs and kickers were of identical construction (except for the kickers having cooling circuits), with C-shaped ferrites sandwiched between C-shaped metal plates and couplers at the back of the C. For reasons explained in 8002234, they were also equipped with shutters which closed the open side of the C when there was beam on the injection orbit. For more on precooling see 8020234, 8004064. |
id | cern-969536 |
institution | Organización Europea para la Investigación Nuclear |
publishDate | 1980 |
record_format | invenio |
spelling | cern-9695362019-09-30T06:29:59Zhttp://cds.cern.ch/record/969536CERN PhotoLabAA precooling pickupAccelerators and associated DevelopmentsThe freshly injected antiprotons, while circulating on the injection orbit, were subjected to fast stochastic "precooling" for several seconds (in momentum and in the vertical plane). This precooling pickup is being readied by Gerard Laurent for installation in its tank. Precooling PUs and kickers were of identical construction (except for the kickers having cooling circuits), with C-shaped ferrites sandwiched between C-shaped metal plates and couplers at the back of the C. For reasons explained in 8002234, they were also equipped with shutters which closed the open side of the C when there was beam on the injection orbit. For more on precooling see 8020234, 8004064.CERN-PHOTO-8002050oai:cds.cern.ch:9695361980 |
spellingShingle | Accelerators and associated Developments CERN PhotoLab AA precooling pickup |
title | AA precooling pickup |
title_full | AA precooling pickup |
title_fullStr | AA precooling pickup |
title_full_unstemmed | AA precooling pickup |
title_short | AA precooling pickup |
title_sort | aa precooling pickup |
topic | Accelerators and associated Developments |
url | http://cds.cern.ch/record/969536 |
work_keys_str_mv | AT cernphotolab aaprecoolingpickup |