Cargando…
AA, radiation shielding curtain along the target area
At the far left is the beam tube for the high-intensity proton beam from the 26 GeV PS. The tube ends in a thin window and the proton beam continues in air through a hole in the shielding blocks (see also 8010308), behind which the target (see 7905091, 7905094)was located. After the target followed...
Autor principal: | CERN PhotoLab |
---|---|
Publicado: |
1980
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/969696 |
Ejemplares similares
-
The AA disappearing under concrete shielding
por: CERN PhotoLab
Publicado: (1982) -
AA antiproton production target
por: CERN PhotoLab
Publicado: (1979) -
AA antiproton production target
por: CERN PhotoLab
Publicado: (1979) -
Outer casing of the AA antiproton production target
por: CERN PhotoLab
Publicado: (1979) -
AA, entrance of proton beam to antiproton production target
por: CERN PhotoLab
Publicado: (1980)