Cargando…

Beam position pickup for antiprotons to the ISR

The Antiproton Project, launched for proton-antiproton collisions in the SPS (SPS collider), had a side-line for p-pbar collisions in the ISR. A new transfer line, TT6, was constructed to transport antiprotons from the 26 GeV PS to the injection line TT1 of ISR ring 2. Antiprotons were a scarce comm...

Descripción completa

Detalles Bibliográficos
Autor principal: CERN PhotoLab
Publicado: 1981
Materias:
Acceso en línea:http://cds.cern.ch/record/969818
Descripción
Sumario:The Antiproton Project, launched for proton-antiproton collisions in the SPS (SPS collider), had a side-line for p-pbar collisions in the ISR. A new transfer line, TT6, was constructed to transport antiprotons from the 26 GeV PS to the injection line TT1 of ISR ring 2. Antiprotons were a scarce commodity. For setting up the lines, beam diagnostic devices in the antiproton path had to work reliably and precisely with just a few low-intensity pilot pules: single bunches of about 2x10**9 antiprotons every few hours. Electrostatic pickup electrodes were used to measure beam position. They could be mounted for measurement in the horizontal plane, as in this picture, or at 90 deg, for the vertical plane.