Cargando…
Posing the first LEAR vacuum chamber
The photo shows one of the four bending magnets of LEAR. They were of C-type with the opening ('mouth') to the outside of the ring (yoke to the inside). Last preparations are made before the vacuum chamber is slid through the mouth into the magnet. Stochastic cooling pickups/kickers were i...
Publicado: |
1982
|
---|---|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/969965 |
_version_ | 1780910685657497600 |
---|---|
collection | CERN |
description | The photo shows one of the four bending magnets of LEAR. They were of C-type with the opening ('mouth') to the outside of the ring (yoke to the inside). Last preparations are made before the vacuum chamber is slid through the mouth into the magnet. Stochastic cooling pickups/kickers were installed inside the chamber. One can distinguish a large number of feed-throughs on the chamber (leading to the pickup/kicker gaps). The free space in the middle of the block was left to offer room for an internal target in the magnet. This possibility was never exploited. Instead it is used here, to accommodate a pumping port for the high vacuum system. Michel Chanel (left) and Pierre Lefevre admire the mechanics at work. |
id | cern-969965 |
institution | Organización Europea para la Investigación Nuclear |
publishDate | 1982 |
record_format | invenio |
spelling | cern-9699652019-09-30T06:29:59Zhttp://cds.cern.ch/record/969965Posing the first LEAR vacuum chamberAccelerators and associated DevelopmentsThe photo shows one of the four bending magnets of LEAR. They were of C-type with the opening ('mouth') to the outside of the ring (yoke to the inside). Last preparations are made before the vacuum chamber is slid through the mouth into the magnet. Stochastic cooling pickups/kickers were installed inside the chamber. One can distinguish a large number of feed-throughs on the chamber (leading to the pickup/kicker gaps). The free space in the middle of the block was left to offer room for an internal target in the magnet. This possibility was never exploited. Instead it is used here, to accommodate a pumping port for the high vacuum system. Michel Chanel (left) and Pierre Lefevre admire the mechanics at work.CERN-PHOTO-8204640oai:cds.cern.ch:9699651982 |
spellingShingle | Accelerators and associated Developments Posing the first LEAR vacuum chamber |
title | Posing the first LEAR vacuum chamber |
title_full | Posing the first LEAR vacuum chamber |
title_fullStr | Posing the first LEAR vacuum chamber |
title_full_unstemmed | Posing the first LEAR vacuum chamber |
title_short | Posing the first LEAR vacuum chamber |
title_sort | posing the first lear vacuum chamber |
topic | Accelerators and associated Developments |
url | http://cds.cern.ch/record/969965 |