Cargando…

Seconday-emission profile monitors at LEAR injection

This is a view against the direction of the beams. Through the right, smaller, opening the beams (protons, antiprotons, H-, later Pb-ions) entered and, after being put on central orbit with septum and kicker, reappeared as circulating beam through the left, larger, opening. Horizontal and vertical p...

Descripción completa

Detalles Bibliográficos
Autor principal: CERN PhotoLab
Publicado: 1982
Materias:
Acceso en línea:http://cds.cern.ch/record/969974
_version_ 1780910687401279488
author CERN PhotoLab
author_facet CERN PhotoLab
author_sort CERN PhotoLab
collection CERN
description This is a view against the direction of the beams. Through the right, smaller, opening the beams (protons, antiprotons, H-, later Pb-ions) entered and, after being put on central orbit with septum and kicker, reappeared as circulating beam through the left, larger, opening. Horizontal and vertical position and density profile of the incoming beam were measured with secondary emission grids. The same measurements were made on the beam after it had completed the first turn in the machine. For this purpose it was prevented from circulating with a beam stopper, mounted through the port at left (not mounted at the time the picture was taken).
id cern-969974
institution Organización Europea para la Investigación Nuclear
publishDate 1982
record_format invenio
spelling cern-9699742019-09-30T06:29:59Zhttp://cds.cern.ch/record/969974CERN PhotoLabSeconday-emission profile monitors at LEAR injectionAccelerators and associated DevelopmentsThis is a view against the direction of the beams. Through the right, smaller, opening the beams (protons, antiprotons, H-, later Pb-ions) entered and, after being put on central orbit with septum and kicker, reappeared as circulating beam through the left, larger, opening. Horizontal and vertical position and density profile of the incoming beam were measured with secondary emission grids. The same measurements were made on the beam after it had completed the first turn in the machine. For this purpose it was prevented from circulating with a beam stopper, mounted through the port at left (not mounted at the time the picture was taken).CERN-PHOTO-8206042oai:cds.cern.ch:9699741982
spellingShingle Accelerators and associated Developments
CERN PhotoLab
Seconday-emission profile monitors at LEAR injection
title Seconday-emission profile monitors at LEAR injection
title_full Seconday-emission profile monitors at LEAR injection
title_fullStr Seconday-emission profile monitors at LEAR injection
title_full_unstemmed Seconday-emission profile monitors at LEAR injection
title_short Seconday-emission profile monitors at LEAR injection
title_sort seconday-emission profile monitors at lear injection
topic Accelerators and associated Developments
url http://cds.cern.ch/record/969974
work_keys_str_mv AT cernphotolab secondayemissionprofilemonitorsatlearinjection