Construction of an access shaft for LEP

The main contract for underground work in the plain was signed end of February 1983. It foresaw a five-month preparation period before the order to start construction work could be issued. The latter was delivered on 1 September. See Annual Report 1983 p. 114

Detalles Bibliográficos
Publicado: 1983
Materias:
Acceso en línea:http://cds.cern.ch/record/970250
_version_ 1780910743230611456
collection CERN
description The main contract for underground work in the plain was signed end of February 1983. It foresaw a five-month preparation period before the order to start construction work could be issued. The latter was delivered on 1 September. See Annual Report 1983 p. 114
id cern-970250
institution Organización Europea para la Investigación Nuclear
publishDate 1983
record_format invenio
spelling cern-9702502019-09-30T06:29:59Zhttp://cds.cern.ch/record/970250Construction of an access shaft for LEPCivil EngineeringThe main contract for underground work in the plain was signed end of February 1983. It foresaw a five-month preparation period before the order to start construction work could be issued. The latter was delivered on 1 September. See Annual Report 1983 p. 114CERN-PHOTO-8310917oai:cds.cern.ch:9702501983
spellingShingle Civil Engineering
Construction of an access shaft for LEP
title Construction of an access shaft for LEP
title_full Construction of an access shaft for LEP
title_fullStr Construction of an access shaft for LEP
title_full_unstemmed Construction of an access shaft for LEP
title_short Construction of an access shaft for LEP
title_sort construction of an access shaft for lep
topic Civil Engineering
url http://cds.cern.ch/record/970250