Cargando…
Construction of an access shaft for LEP
The main contract for underground work in the plain was signed end of February 1983. It foresaw a five-month preparation period before the order to start construction work could be issued. The latter was delivered on 1 September. See Annual Report 1983 p. 114
Publicado: |
1983
|
---|---|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/970250 |
Ejemplares similares
-
PGCN shaft
por: Valeriane Duvivier
Publicado: (2001) -
Shaft PM 56
por: Valeriane Duvivier
Publicado: (2001) -
Excavation of the PGCN shaft
por: Valeriane Duvivier
Publicado: (2000) -
Excavation of the PGCN shaft
por: Valeriane Duvivier
Publicado: (2001) -
PGCN shaft head
por: Valeriane Duvivier
Publicado: (2001)