Electrical Integrity Tests during Production of the LHC Dipoles
For the LHC dipoles, mandatory electrical integrity tests are performed to qualify the cold mass (CM) at four production stages: individual pole, collared coil, CM before end cover welding and final CM. A description of the measurement equipment and its recent development are presented. After passin...
Autores principales: | , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2006
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2006.870501 http://cds.cern.ch/record/970363 |
_version_ | 1780910757771214848 |
---|---|
author | de Rijk, G Bajko, M Cornelis, M Fessia, P Miles, J Modena, M Molinari, G Rinn, J Savary, F Vlogaert, J |
author_facet | de Rijk, G Bajko, M Cornelis, M Fessia, P Miles, J Modena, M Molinari, G Rinn, J Savary, F Vlogaert, J |
author_sort | de Rijk, G |
collection | CERN |
description | For the LHC dipoles, mandatory electrical integrity tests are performed to qualify the cold mass (CM) at four production stages: individual pole, collared coil, CM before end cover welding and final CM. A description of the measurement equipment and its recent development are presented. After passing the demands set out in the specification, the results of the tests are transmitted to CERN where they are further analyzed. The paper presents the most important results of these measurements. We also report a review of the electrical non-conformities encountered e.g. interturn shorts and quench heater failure, their diagnostic and the cures. |
id | cern-970363 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2006 |
record_format | invenio |
spelling | cern-9703632023-05-31T13:23:56Zdoi:10.1109/TASC.2006.870501http://cds.cern.ch/record/970363engde Rijk, GBajko, MCornelis, MFessia, PMiles, JModena, MMolinari, GRinn, JSavary, FVlogaert, JElectrical Integrity Tests during Production of the LHC DipolesAccelerators and Storage RingsFor the LHC dipoles, mandatory electrical integrity tests are performed to qualify the cold mass (CM) at four production stages: individual pole, collared coil, CM before end cover welding and final CM. A description of the measurement equipment and its recent development are presented. After passing the demands set out in the specification, the results of the tests are transmitted to CERN where they are further analyzed. The paper presents the most important results of these measurements. We also report a review of the electrical non-conformities encountered e.g. interturn shorts and quench heater failure, their diagnostic and the cures.LHC-PROJECT-Report-880CERN-LHC-Project-Report-880oai:cds.cern.ch:9703632006-05-19 |
spellingShingle | Accelerators and Storage Rings de Rijk, G Bajko, M Cornelis, M Fessia, P Miles, J Modena, M Molinari, G Rinn, J Savary, F Vlogaert, J Electrical Integrity Tests during Production of the LHC Dipoles |
title | Electrical Integrity Tests during Production of the LHC Dipoles |
title_full | Electrical Integrity Tests during Production of the LHC Dipoles |
title_fullStr | Electrical Integrity Tests during Production of the LHC Dipoles |
title_full_unstemmed | Electrical Integrity Tests during Production of the LHC Dipoles |
title_short | Electrical Integrity Tests during Production of the LHC Dipoles |
title_sort | electrical integrity tests during production of the lhc dipoles |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.1109/TASC.2006.870501 http://cds.cern.ch/record/970363 |
work_keys_str_mv | AT derijkg electricalintegritytestsduringproductionofthelhcdipoles AT bajkom electricalintegritytestsduringproductionofthelhcdipoles AT cornelism electricalintegritytestsduringproductionofthelhcdipoles AT fessiap electricalintegritytestsduringproductionofthelhcdipoles AT milesj electricalintegritytestsduringproductionofthelhcdipoles AT modenam electricalintegritytestsduringproductionofthelhcdipoles AT molinarig electricalintegritytestsduringproductionofthelhcdipoles AT rinnj electricalintegritytestsduringproductionofthelhcdipoles AT savaryf electricalintegritytestsduringproductionofthelhcdipoles AT vlogaertj electricalintegritytestsduringproductionofthelhcdipoles |