Cargando…

Electrical Integrity Tests during Production of the LHC Dipoles

For the LHC dipoles, mandatory electrical integrity tests are performed to qualify the cold mass (CM) at four production stages: individual pole, collared coil, CM before end cover welding and final CM. A description of the measurement equipment and its recent development are presented. After passin...

Descripción completa

Detalles Bibliográficos
Autores principales: de Rijk, G, Bajko, M, Cornelis, M, Fessia, P, Miles, J, Modena, M, Molinari, G, Rinn, J, Savary, F, Vlogaert, J
Lenguaje:eng
Publicado: 2006
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2006.870501
http://cds.cern.ch/record/970363
_version_ 1780910757771214848
author de Rijk, G
Bajko, M
Cornelis, M
Fessia, P
Miles, J
Modena, M
Molinari, G
Rinn, J
Savary, F
Vlogaert, J
author_facet de Rijk, G
Bajko, M
Cornelis, M
Fessia, P
Miles, J
Modena, M
Molinari, G
Rinn, J
Savary, F
Vlogaert, J
author_sort de Rijk, G
collection CERN
description For the LHC dipoles, mandatory electrical integrity tests are performed to qualify the cold mass (CM) at four production stages: individual pole, collared coil, CM before end cover welding and final CM. A description of the measurement equipment and its recent development are presented. After passing the demands set out in the specification, the results of the tests are transmitted to CERN where they are further analyzed. The paper presents the most important results of these measurements. We also report a review of the electrical non-conformities encountered e.g. interturn shorts and quench heater failure, their diagnostic and the cures.
id cern-970363
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2006
record_format invenio
spelling cern-9703632023-05-31T13:23:56Zdoi:10.1109/TASC.2006.870501http://cds.cern.ch/record/970363engde Rijk, GBajko, MCornelis, MFessia, PMiles, JModena, MMolinari, GRinn, JSavary, FVlogaert, JElectrical Integrity Tests during Production of the LHC DipolesAccelerators and Storage RingsFor the LHC dipoles, mandatory electrical integrity tests are performed to qualify the cold mass (CM) at four production stages: individual pole, collared coil, CM before end cover welding and final CM. A description of the measurement equipment and its recent development are presented. After passing the demands set out in the specification, the results of the tests are transmitted to CERN where they are further analyzed. The paper presents the most important results of these measurements. We also report a review of the electrical non-conformities encountered e.g. interturn shorts and quench heater failure, their diagnostic and the cures.LHC-PROJECT-Report-880CERN-LHC-Project-Report-880oai:cds.cern.ch:9703632006-05-19
spellingShingle Accelerators and Storage Rings
de Rijk, G
Bajko, M
Cornelis, M
Fessia, P
Miles, J
Modena, M
Molinari, G
Rinn, J
Savary, F
Vlogaert, J
Electrical Integrity Tests during Production of the LHC Dipoles
title Electrical Integrity Tests during Production of the LHC Dipoles
title_full Electrical Integrity Tests during Production of the LHC Dipoles
title_fullStr Electrical Integrity Tests during Production of the LHC Dipoles
title_full_unstemmed Electrical Integrity Tests during Production of the LHC Dipoles
title_short Electrical Integrity Tests during Production of the LHC Dipoles
title_sort electrical integrity tests during production of the lhc dipoles
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1109/TASC.2006.870501
http://cds.cern.ch/record/970363
work_keys_str_mv AT derijkg electricalintegritytestsduringproductionofthelhcdipoles
AT bajkom electricalintegritytestsduringproductionofthelhcdipoles
AT cornelism electricalintegritytestsduringproductionofthelhcdipoles
AT fessiap electricalintegritytestsduringproductionofthelhcdipoles
AT milesj electricalintegritytestsduringproductionofthelhcdipoles
AT modenam electricalintegritytestsduringproductionofthelhcdipoles
AT molinarig electricalintegritytestsduringproductionofthelhcdipoles
AT rinnj electricalintegritytestsduringproductionofthelhcdipoles
AT savaryf electricalintegritytestsduringproductionofthelhcdipoles
AT vlogaertj electricalintegritytestsduringproductionofthelhcdipoles