Cargando…

Electrical Integrity Tests during Production of the LHC Dipoles

For the LHC dipoles, mandatory electrical integrity tests are performed to qualify the cold mass (CM) at four production stages: individual pole, collared coil, CM before end cover welding and final CM. A description of the measurement equipment and its recent development are presented. After passin...

Descripción completa

Detalles Bibliográficos
Autores principales: de Rijk, G, Bajko, M, Cornelis, M, Fessia, P, Miles, J, Modena, M, Molinari, G, Rinn, J, Savary, F, Vlogaert, J
Lenguaje:eng
Publicado: 2006
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2006.870501
http://cds.cern.ch/record/970363

Ejemplares similares