Electrical Integrity Tests during Production of the LHC Dipoles
For the LHC dipoles, mandatory electrical integrity tests are performed to qualify the cold mass (CM) at four production stages: individual pole, collared coil, CM before end cover welding and final CM. A description of the measurement equipment and its recent development are presented. After passin...
Autores principales: | de Rijk, G, Bajko, M, Cornelis, M, Fessia, P, Miles, J, Modena, M, Molinari, G, Rinn, J, Savary, F, Vlogaert, J |
---|---|
Lenguaje: | eng |
Publicado: |
2006
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2006.870501 http://cds.cern.ch/record/970363 |
Ejemplares similares
-
Status of the LHC Main Dipole Pre-Series Production
por: Modena, M, et al.
Publicado: (2003) -
LHC Superconducting Dipole Production Follow-up: Results of Audit on QA Aspects in Industry
por: Modena, M, et al.
Publicado: (2006) -
Status Report on the LHC Main Magnet Production
por: de Rijk, G, et al.
Publicado: (2005) -
Status Report on the Superconducting Dipole Magnet Production for the LHC
por: Bajko, M, et al.
Publicado: (2007) -
Quality Control Techniques Applied to the Large Scale Production of Superconducting Dipole Magnets for LHC
por: Savary, F, et al.
Publicado: (2006)