Cargando…

The LHC Main Quadrupoles during Series Fabrication

By the end of August 2005 about 320 of the 400 main LHC quadrupole magnets have been fabricated and about 220 of them assembled into their cold masses, together with corrector magnets. About 130 of them have been cold tested in their cryostats and most of the quadrupoles exceeded their nominal excit...

Descripción completa

Detalles Bibliográficos
Autores principales: Tortschanoff, Theodor, Burgmer, R, Durante, M, Hagen, P, Klein, U, Krischel, D, Payn, A, Rossi, L, Schellong, B, Schmidt, P, Simon, F, Schirm, K-M, Todesco, E
Lenguaje:eng
Publicado: 2006
Materias:
Acceso en línea:http://cds.cern.ch/record/970394
_version_ 1780910761552379904
author Tortschanoff, Theodor
Burgmer, R
Durante, M
Hagen, P
Klein, U
Krischel, D
Payn, A
Rossi, L
Schellong, B
Schmidt, P
Simon, F
Schirm, K-M
Todesco, E
author_facet Tortschanoff, Theodor
Burgmer, R
Durante, M
Hagen, P
Klein, U
Krischel, D
Payn, A
Rossi, L
Schellong, B
Schmidt, P
Simon, F
Schirm, K-M
Todesco, E
author_sort Tortschanoff, Theodor
collection CERN
description By the end of August 2005 about 320 of the 400 main LHC quadrupole magnets have been fabricated and about 220 of them assembled into their cold masses, together with corrector magnets. About 130 of them have been cold tested in their cryostats and most of the quadrupoles exceeded their nominal excitation, i.e. 12,000 A, after no more than two training quenches. During this series fabrication, the quality of the magnets and cold masses was thoroughly monitored by means of warm magnetic field measurements, of strict geometrical checking, and of various electrical verifications. A number of modifications were introduced in order to improve the magnet fabrication, mainly correction of the coil geometry for achieving the specified field quality and measures for avoiding coil insulation problems. Further changes concern the electrical connectivity and insulation of instrumentation, and of the corrector magnets inside the cold masses. The contact resistances for the bus-bar connections to the quench protection diodes and the elimination of insulation problems of the main bus-bars required special attention. To this must be added actions for solving of interface problems to the neighbouring magnets in the machine and to the cryogenic feed line.
id cern-970394
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2006
record_format invenio
spelling cern-9703942023-05-31T13:24:32Zhttp://cds.cern.ch/record/970394engTortschanoff, TheodorBurgmer, RDurante, MHagen, PKlein, UKrischel, DPayn, ARossi, LSchellong, BSchmidt, PSimon, FSchirm, K-MTodesco, EThe LHC Main Quadrupoles during Series FabricationAccelerators and Storage RingsBy the end of August 2005 about 320 of the 400 main LHC quadrupole magnets have been fabricated and about 220 of them assembled into their cold masses, together with corrector magnets. About 130 of them have been cold tested in their cryostats and most of the quadrupoles exceeded their nominal excitation, i.e. 12,000 A, after no more than two training quenches. During this series fabrication, the quality of the magnets and cold masses was thoroughly monitored by means of warm magnetic field measurements, of strict geometrical checking, and of various electrical verifications. A number of modifications were introduced in order to improve the magnet fabrication, mainly correction of the coil geometry for achieving the specified field quality and measures for avoiding coil insulation problems. Further changes concern the electrical connectivity and insulation of instrumentation, and of the corrector magnets inside the cold masses. The contact resistances for the bus-bar connections to the quench protection diodes and the elimination of insulation problems of the main bus-bars required special attention. To this must be added actions for solving of interface problems to the neighbouring magnets in the machine and to the cryogenic feed line.LHC-PROJECT-Report-897CERN-LHC-Project-Report-897oai:cds.cern.ch:9703942006-05-19
spellingShingle Accelerators and Storage Rings
Tortschanoff, Theodor
Burgmer, R
Durante, M
Hagen, P
Klein, U
Krischel, D
Payn, A
Rossi, L
Schellong, B
Schmidt, P
Simon, F
Schirm, K-M
Todesco, E
The LHC Main Quadrupoles during Series Fabrication
title The LHC Main Quadrupoles during Series Fabrication
title_full The LHC Main Quadrupoles during Series Fabrication
title_fullStr The LHC Main Quadrupoles during Series Fabrication
title_full_unstemmed The LHC Main Quadrupoles during Series Fabrication
title_short The LHC Main Quadrupoles during Series Fabrication
title_sort lhc main quadrupoles during series fabrication
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/970394
work_keys_str_mv AT tortschanofftheodor thelhcmainquadrupolesduringseriesfabrication
AT burgmerr thelhcmainquadrupolesduringseriesfabrication
AT durantem thelhcmainquadrupolesduringseriesfabrication
AT hagenp thelhcmainquadrupolesduringseriesfabrication
AT kleinu thelhcmainquadrupolesduringseriesfabrication
AT krischeld thelhcmainquadrupolesduringseriesfabrication
AT payna thelhcmainquadrupolesduringseriesfabrication
AT rossil thelhcmainquadrupolesduringseriesfabrication
AT schellongb thelhcmainquadrupolesduringseriesfabrication
AT schmidtp thelhcmainquadrupolesduringseriesfabrication
AT simonf thelhcmainquadrupolesduringseriesfabrication
AT schirmkm thelhcmainquadrupolesduringseriesfabrication
AT todescoe thelhcmainquadrupolesduringseriesfabrication
AT tortschanofftheodor lhcmainquadrupolesduringseriesfabrication
AT burgmerr lhcmainquadrupolesduringseriesfabrication
AT durantem lhcmainquadrupolesduringseriesfabrication
AT hagenp lhcmainquadrupolesduringseriesfabrication
AT kleinu lhcmainquadrupolesduringseriesfabrication
AT krischeld lhcmainquadrupolesduringseriesfabrication
AT payna lhcmainquadrupolesduringseriesfabrication
AT rossil lhcmainquadrupolesduringseriesfabrication
AT schellongb lhcmainquadrupolesduringseriesfabrication
AT schmidtp lhcmainquadrupolesduringseriesfabrication
AT simonf lhcmainquadrupolesduringseriesfabrication
AT schirmkm lhcmainquadrupolesduringseriesfabrication
AT todescoe lhcmainquadrupolesduringseriesfabrication