Review of the R&D and Supply of the LHC Superconducting Cables

The construction of the superconducting magnets for the LHC machine has required the supply of ~ 7350 km of superconducting cables. The delivery of cables which is completed at 97% has made use of a large part of the world wide production capacity. Ten contracts have been placed with firms in Europ...

Descripción completa

Detalles Bibliográficos
Autor principal: Leroy, D
Lenguaje:eng
Publicado: 2006
Materias:
Acceso en línea:http://cds.cern.ch/record/970398
_version_ 1780910762438426624
author Leroy, D
author_facet Leroy, D
author_sort Leroy, D
collection CERN
description The construction of the superconducting magnets for the LHC machine has required the supply of ~ 7350 km of superconducting cables. The delivery of cables which is completed at 97% has made use of a large part of the world wide production capacity. Ten contracts have been placed with firms in Europe, Japan, USA. The Nb-Ti and the Nb materials have been contracted by CERN. Before tendering and placing the contracts, a R&D program has combined studies at CERN and orders of finished cables of significant lengths to industry. The report will present the main results of the R&D program, the characteristics of the LHC cables, the encountered difficulties and the obtained successes during the long duration fabrication contracts of the highly sophisticated LHC superconducting cables.
id cern-970398
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2006
record_format invenio
spelling cern-9703982023-05-31T13:24:02Zhttp://cds.cern.ch/record/970398engLeroy, DReview of the R&D and Supply of the LHC Superconducting CablesAccelerators and Storage RingsThe construction of the superconducting magnets for the LHC machine has required the supply of ~ 7350 km of superconducting cables. The delivery of cables which is completed at 97% has made use of a large part of the world wide production capacity. Ten contracts have been placed with firms in Europe, Japan, USA. The Nb-Ti and the Nb materials have been contracted by CERN. Before tendering and placing the contracts, a R&D program has combined studies at CERN and orders of finished cables of significant lengths to industry. The report will present the main results of the R&D program, the characteristics of the LHC cables, the encountered difficulties and the obtained successes during the long duration fabrication contracts of the highly sophisticated LHC superconducting cables.LHC-PROJECT-Report-901CERN-LHC-Project-Report-901oai:cds.cern.ch:9703982006-05-19
spellingShingle Accelerators and Storage Rings
Leroy, D
Review of the R&D and Supply of the LHC Superconducting Cables
title Review of the R&D and Supply of the LHC Superconducting Cables
title_full Review of the R&D and Supply of the LHC Superconducting Cables
title_fullStr Review of the R&D and Supply of the LHC Superconducting Cables
title_full_unstemmed Review of the R&D and Supply of the LHC Superconducting Cables
title_short Review of the R&D and Supply of the LHC Superconducting Cables
title_sort review of the r&d and supply of the lhc superconducting cables
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/970398
work_keys_str_mv AT leroyd reviewoftherdandsupplyofthelhcsuperconductingcables