The LHC Dipole Geometry as Built in Industry

The LHC dipoles magnets are produced in 5 industrial production sites in Europe. The production is well underway and more than half of the total quantity has been delivered to CERN. One of the important characteristics of the dipole magnets is their geometry. To achieve the requested mechanical tole...

Descripción completa

Detalles Bibliográficos
Autores principales: Bajko, M, Chamizo, R, Charrondiere, C, Kuzmin, A, Savary, F
Lenguaje:eng
Publicado: 2006
Materias:
Acceso en línea:http://cds.cern.ch/record/970400
_version_ 1780910762873585664
author Bajko, M
Chamizo, R
Charrondiere, C
Kuzmin, A
Savary, F
author_facet Bajko, M
Chamizo, R
Charrondiere, C
Kuzmin, A
Savary, F
author_sort Bajko, M
collection CERN
description The LHC dipoles magnets are produced in 5 industrial production sites in Europe. The production is well underway and more than half of the total quantity has been delivered to CERN. One of the important characteristics of the dipole magnets is their geometry. To achieve the requested mechanical tolerances on the magnets, which are 15 m long and have a 28 t mass, the final assembly operations includes precise optical measurements. To ensure the good quality and high production rate, the final assembly procedure has been automated as much as possible. The authors report here about the assembly procedure, the features of the software that guides the optical measurements (and consequently the assembly operations) and the results obtained on the geometry in the different sites.
id cern-970400
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2006
record_format invenio
spelling cern-9704002023-05-31T13:24:02Zhttp://cds.cern.ch/record/970400engBajko, MChamizo, RCharrondiere, CKuzmin, ASavary, FThe LHC Dipole Geometry as Built in IndustryAccelerators and Storage RingsThe LHC dipoles magnets are produced in 5 industrial production sites in Europe. The production is well underway and more than half of the total quantity has been delivered to CERN. One of the important characteristics of the dipole magnets is their geometry. To achieve the requested mechanical tolerances on the magnets, which are 15 m long and have a 28 t mass, the final assembly operations includes precise optical measurements. To ensure the good quality and high production rate, the final assembly procedure has been automated as much as possible. The authors report here about the assembly procedure, the features of the software that guides the optical measurements (and consequently the assembly operations) and the results obtained on the geometry in the different sites.LHC-PROJECT-Report-902CERN-LHC-Project-Report-902oai:cds.cern.ch:9704002006-05-19
spellingShingle Accelerators and Storage Rings
Bajko, M
Chamizo, R
Charrondiere, C
Kuzmin, A
Savary, F
The LHC Dipole Geometry as Built in Industry
title The LHC Dipole Geometry as Built in Industry
title_full The LHC Dipole Geometry as Built in Industry
title_fullStr The LHC Dipole Geometry as Built in Industry
title_full_unstemmed The LHC Dipole Geometry as Built in Industry
title_short The LHC Dipole Geometry as Built in Industry
title_sort lhc dipole geometry as built in industry
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/970400
work_keys_str_mv AT bajkom thelhcdipolegeometryasbuiltinindustry
AT chamizor thelhcdipolegeometryasbuiltinindustry
AT charrondierec thelhcdipolegeometryasbuiltinindustry
AT kuzmina thelhcdipolegeometryasbuiltinindustry
AT savaryf thelhcdipolegeometryasbuiltinindustry
AT bajkom lhcdipolegeometryasbuiltinindustry
AT chamizor lhcdipolegeometryasbuiltinindustry
AT charrondierec lhcdipolegeometryasbuiltinindustry
AT kuzmina lhcdipolegeometryasbuiltinindustry
AT savaryf lhcdipolegeometryasbuiltinindustry