Cargando…

Calibration Measurements of the LHC Beam Dumping System Extraction Kicker Magnets

The LHC beam dumping system must protect the LHC machine from damage by reliably and safely extracting and absorbing the circulating beams when requested. Two sets of 15 extraction kicker magnets form the main active part of this system. They have been produced, tested and calibrated by measuring th...

Descripción completa

Detalles Bibliográficos
Autores principales: Uythoven, J, Castronuovo, F, Ducimetière, L, Goddard, B, Gräwer, G, Olivieri, F, Pereira, L, Vossenberg, Eugène B
Lenguaje:eng
Publicado: 2007
Materias:
Acceso en línea:http://cds.cern.ch/record/972206
_version_ 1780910821521489920
author Uythoven, J
Castronuovo, F
Ducimetière, L
Goddard, B
Gräwer, G
Olivieri, F
Pereira, L
Vossenberg, Eugène B
author_facet Uythoven, J
Castronuovo, F
Ducimetière, L
Goddard, B
Gräwer, G
Olivieri, F
Pereira, L
Vossenberg, Eugène B
author_sort Uythoven, J
collection CERN
description The LHC beam dumping system must protect the LHC machine from damage by reliably and safely extracting and absorbing the circulating beams when requested. Two sets of 15 extraction kicker magnets form the main active part of this system. They have been produced, tested and calibrated by measuring the integrated magnetic field and the magnet current at different beam energies. The calibration data have been analysed, and the critical parameters are compared with the specifications. Implications for the configuration, control and operation of the beam dumping system are discussed.
id cern-972206
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2007
record_format invenio
spelling cern-9722062023-05-31T13:23:31Zhttp://cds.cern.ch/record/972206engUythoven, JCastronuovo, FDucimetière, LGoddard, BGräwer, GOlivieri, FPereira, LVossenberg, Eugène BCalibration Measurements of the LHC Beam Dumping System Extraction Kicker MagnetsAccelerators and Storage RingsThe LHC beam dumping system must protect the LHC machine from damage by reliably and safely extracting and absorbing the circulating beams when requested. Two sets of 15 extraction kicker magnets form the main active part of this system. They have been produced, tested and calibrated by measuring the integrated magnetic field and the magnet current at different beam energies. The calibration data have been analysed, and the critical parameters are compared with the specifications. Implications for the configuration, control and operation of the beam dumping system are discussed.LHC-PROJECT-Report-917CERN-LHC-Project-Report-917oai:cds.cern.ch:9722062007-07-13
spellingShingle Accelerators and Storage Rings
Uythoven, J
Castronuovo, F
Ducimetière, L
Goddard, B
Gräwer, G
Olivieri, F
Pereira, L
Vossenberg, Eugène B
Calibration Measurements of the LHC Beam Dumping System Extraction Kicker Magnets
title Calibration Measurements of the LHC Beam Dumping System Extraction Kicker Magnets
title_full Calibration Measurements of the LHC Beam Dumping System Extraction Kicker Magnets
title_fullStr Calibration Measurements of the LHC Beam Dumping System Extraction Kicker Magnets
title_full_unstemmed Calibration Measurements of the LHC Beam Dumping System Extraction Kicker Magnets
title_short Calibration Measurements of the LHC Beam Dumping System Extraction Kicker Magnets
title_sort calibration measurements of the lhc beam dumping system extraction kicker magnets
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/972206
work_keys_str_mv AT uythovenj calibrationmeasurementsofthelhcbeamdumpingsystemextractionkickermagnets
AT castronuovof calibrationmeasurementsofthelhcbeamdumpingsystemextractionkickermagnets
AT ducimetierel calibrationmeasurementsofthelhcbeamdumpingsystemextractionkickermagnets
AT goddardb calibrationmeasurementsofthelhcbeamdumpingsystemextractionkickermagnets
AT grawerg calibrationmeasurementsofthelhcbeamdumpingsystemextractionkickermagnets
AT olivierif calibrationmeasurementsofthelhcbeamdumpingsystemextractionkickermagnets
AT pereiral calibrationmeasurementsofthelhcbeamdumpingsystemextractionkickermagnets
AT vossenbergeugeneb calibrationmeasurementsofthelhcbeamdumpingsystemextractionkickermagnets