Cargando…
Beam dynamics studies and emittance optimization in the CTF3 linac at CERN
Small transverse beam emittances and well-known lattice functions are crucial for the 30 GHz power production in the Power Extraction and Transfer Structure (PETS) and for the commissioning of the Delay Loop of the CLIC Test Facility 3 (CTF3). Following beam dynamics simulation results, two addition...
Autores principales: | Urschütz, Peter, Braun, Hans-Heinrich, Corsini, Roberto, Döbert, Steffen, Ferrari, Arnaud, Tecker, Frank |
---|---|
Lenguaje: | eng |
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/972669 |
Ejemplares similares
-
Efficient long-pulse fully-loaded CTF3 linac operation
por: Braun, Hans Heinrich, et al.
Publicado: (2006) -
Longitudinal beam profile measurements at CTF3 using a streak camera
por: Welsch, Carsten P, et al.
Publicado: (2006) -
Beam Dynamics and First Operation of the Sub-Harmonic Bunching System in the CTF3 Injector
por: Urschütz, Peter, et al.
Publicado: (2006) -
CTF3 Combiner Ring Commissioning
por: Tecker, F, et al.
Publicado: (2007) -
Beam Tests at the CLIC Test Facility, CTF3
por: Corsini, Roberto, et al.
Publicado: (2014)